3501–3555 Cesar Chavez Street
Bernal Heights · San Francisco, CA 94110
-
1967
Saint Luke's Hospital, designed by Gardner A. Dailey.
-
1970
A twelve-storey, 158-foot hospital tower stood near the north-east corner of the St. Luke's campus, the most prominent building on it.
-
Nov 1981
Additions alterations or repairs.
-
Aug 2005
Renovation of library reception area on 2nd floor (approx 1450 sq ft) for n breast health mediacl off.
-
Apr 2014
Temporary shoring.
-
May 2014
To modernize the 2 existing hydraulic elevators and mechanical room. replace cab finishes and elevator controls to remove barriers to accessibility. maher n/a. elevator monitoring alarm under separate permit.
-
Mar 2016
Installation of new underground fuel tank and pipping hook up electrical commissioning of fuel tank and monitoring system.
-
Apr 2016
4th floor - remodel existing radiology rooms for new radiology room & control room.
-
Nov 2017
1st floor: install new emergency generator and related equipment on new concrete pads within existing outdoor uncovered service yard. install new green wall/plant screen fence and gate at entrance to the yard. for maher.
-
Nov 2017
Basement-1st floor: partial interior remodel of monteagle. basement &1st floor: (initial demolition pender 201707182106)mechanical & electrical under separate permit. n/a for maher.
-
2018
Built.
-
Jul 2018
1st and 2nd floor. interior demolition on 1st & 2nd level. build back outpaitent medical offices on both levels. mep included & structural.
-
Jul 2018
(1st floor-central courtyard): new disable access ramps and entry enclosure to parking garage. enclose garage entry with glass vestibule, new hardware to elevator lobbies. maher n/a.
-
Oct 2018
The project consists of a non-structural interior demolition of 2 vacant buildings on sutter mission bernal campus. the 1957 building scope includes interior demolition of a 31, 724 sq ft, 4 story building. the 1970 building interior demolition scope includes 200, 000 sq ft 12 story building with a basment. soft demolition will commence upon.
-
Oct 2018
1st, 2nd and roof - interior and exterior selective demolition for hartzell ti project ti under separate permit.
-
Oct 2018
Basement selective demolition of e abandoned domestic water tank and associated piping in the hartzell cup. install new distribution board and pull box for utilize tie in.
-
Dec 2018
To demolish a type 1-b, 12-story hospital with one basement.
-
Apr 2019
Major alteration project consist of partial structural removel of a 4 story 31, 274 sq foot existing 1957 building and recladding of the remaining 1859 square foot stairwell.
-
May 2019
Replace existing electric driven fire pumps in basement with one new electric driven fire pump and controller per nfpa 20 in same room/location as existing. reuse existing utilities. fire pump to be provide with emegency electrical power.
-
Apr 2020
Erect a five story type ib construction building with medical office, retail, amnd parking on 4 below ground levels.
-
Aug 2020
Installation of subsurgace sanitary sewer and portable water tanks, temporary tree farm and interim parking.
-
Oct 2022
Reroofing.
-
Oct 2023
Work on 1st floor only - eeg procedure room remodel. remodel includes enlarging the existing eeg procedure room. reconfigure ceiling and door hardware.
-
Oct 2023
Interior demolition per ab 017 on levels 1, 3, 4, 6.
-
May 2024
3/f: interior t.i. construction of new medical office primary care clinic in existing 8-story monteagle medical office building. separate interior demolition under permit 202310108295.
-
Oct 2024
6/fl-ti for new medical office space.
-
Nov 2024
A make ready scope of re-routing the egress path of existing 1957 building to discharge to second floor lobby for north exit and partial demolition of second floor of existing 1957 lobby.
-
Feb 2025
Lvl 1- change finishes, flooring, ceiling, signage & wall coverings, new light & fix, mechnical, new power door assist to restrooms. lvl 4- build out new obgyn clinic with 16 exam rooms, 1-treatment, 1-nst & 1-conference room. deferred fire alarm & sprinklers.
DBI holds 189 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 189. 22 of them are nominal $1 street-space or sidewalk permits. A citywide context statement records work at this address dated 1967; the assessor's roll dates the structure on this parcel to 2018. Whether the building described still stands here is unsettled.
Nearby
- 3450–3458 Cesar Chavez Street Same street
- 3718–3724 Cesar Chavez Street Same street
- 1500 Valencia Street Around the corner
- 1501–1509 Valencia Street Around the corner
- 530 Bartlett Street Around the corner