470–498 Pacific Avenue
Chinatown · San Francisco, CA 94133
Permit history
-
Oct 1985
Roof parapet work repair.
-
Mar 1992
Replace non-historic storefront, add elevator & skylight, etc.
-
Oct 1992
Corrections to previous seismic work-wall to floor connections.
-
Apr 1997
Modifications for tenant improvements h.c. complaice.
-
Jul 1997
Interior tenant improvements restaurant.
-
Sep 1997
Fire sprinklers.
-
Feb 1998
T i ground floor, new cafe counter, & shell work.
-
Mar 1998
Oti 1 el me sp 2nd floor.
-
May 1998
Oti 2 2nd fl el, me.
-
Jun 1998
Oti-1 2/f (el mc sp.
-
Sep 2004
Restaurant remodel on the ground level. project scope includes new floor finishes, new millwork, furni.
-
Aug 2008
Minor interior demolition to remove partitions, stairs, casework, skyiht and four columns. scope of work includes infill of skylight at 2nd floor and new joists and beams after removal of columns. mep under separate pemit.
-
Sep 2008
Exterior alteration to existing restaurant. increase of ground floor envelope by approx 140 sq ft. new store front and entry door. no interior construction.
-
Jan 2009
Remodel existing cafe on ground floor. work includes new partitions, kitchen equipment, lighting and mechanical, new finishes, minor slab infill. no exterior work. fire protection under separate permit.
-
Apr 2009
Remodel existing restaurant; work includes new partitions, fixtures, finishes, equipment, new lighting & mechanical. minor slab infill. fire protection and sprinklers under separate permit, no exterior work. new type i & 2 hoods and kitchen configuration.
-
May 2009
New lighting and power for ti previously approved under 200904176554.
-
Jul 2009
Mechanical. equipment penetrations at 2nd fl and roof including curb details at roof. structural work revisions to approved permit application 2009.04.17.6554.
-
Oct 2013
Remodel of existing restaurant storefront entry; relocate existing entry door in new alcove, replace existing door with storefront to match existing, add small awning, lights & signage.sprinkler seperate permit.
-
Nov 2013
Remodel existing quince restaurant to include renovations to existing dining room including relocating bar. renovations to existing kitchen including new equipment.
-
Apr 2014
Remodel portions of an existing office at 2nd floor above quince restaurant including demolition, new partitoins, reinstall windows, new dining for office use, add new unisex bathroom.office brake room.
-
Dec 2021
Renovation to existing dining rm, relocate bar with ada compliant seating area. relocate bathrooms.
-
Jun 2022
Replacement of existing storefront. demolish and replace storefront with new in existing opening.
-
Nov 2022
Renovate back of house kitchen and prep areas, addition of gelato clean room, new floor and wall finishes, new equipment, new lighting, code compliance upgrade of level one mens room and entry door.
-
Apr 2023
New hearth in existing kitchen with associated mep (fan/flue to roof) using coal max 250 lbs storage. fire alarm/sprinklers/hood & duct suppression system all under separate permits.
-
Jul 2023
Revision to permit application 202212239073 & 202112234962, relocate service bar to anteroom, new partitions, update mep per plan.
DBI holds 68 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 68. 9 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update