570–578 Pacific Avenue
Chinatown · San Francisco, CA 94133
Permit history
-
Oct 1982
Building use: coml/offices.
-
Aug 1997
Barrior removal only, upgrade elevator controls & features.
-
Nov 1997
Interior non-stuct demolition, entry ramp/toilet rm @ grd floor.
-
Mar 1998
Seismic upgrade.
-
Jun 1998
Reroofing.
-
Jun 1998
New ground floor storefront.
-
Jul 1998
Oti- el, me, 1st floor.
-
Sep 1998
Oti 2 1st floor el me.
-
Dec 1999
Upgrade toilet rms(2nd&3rd floors), 1st fl: smoke curtain.
-
Feb 2000
Oti-1, 2nd floor, el, me, l/s, sp.
-
Feb 2000
Oti-1 3rd floor el, me, l/s, sp.
-
Mar 2000
Remove stairs/refill.
-
Jan 2003
Rebuild basement sidewalk for transformer room.
-
May 2013
Interior renovations including accessibility upgrades, installation of an automatic sprinkler system (separate permit), new connecting stair between levels 3 & 4 & minor demolition. mep, fs, & structual to be filed under separate permit.
-
Jul 2013
Structural work only-add feature stairs, fill in existing voids in various locations. add false floor & add accessibility ramp.
-
Jul 2013
Install new fire sprinkler system in existing 4 story building. ref. t.i. #201305298112.
-
Dec 2013
Portion of 3rd & 4th floor only - remove (1) existing a/v unit + (1) existing condensing unit, furnish installing, (1) new a/c unit + (1) new condensing unit, connect new units ot existing duct, ref permit application 2013.0529.8112.
-
Aug 2015
Grnd floor: commerical ti - selective demolition and new construction. work partitions, door, frames, electrical and plumbing and finishes.
-
Apr 2016
Retaining wall along east side of building.
-
Nov 2019
2nd fl: t.i. selective demolition of partitions etc, new interior partitions doors and glazing, mep, and fire protection under separate permit.
-
Feb 2020
Ref# 2019-1106-6607: install new decorative lights. provide new power throughout.
-
Feb 2025
2/fl- interior only renovation of 2nd floor for a single tenant improvement. all new walls are non load bearing, creating amenities such as (2) offices and a conference room. mep deferred.
-
Mar 2025
Install new low side duct per new tenant space layout. ref permit application 202502100003.
-
May 2025
Ti retrofit light fixture and associated circuiting/controls. ref 2025-02-10-0003.
DBI holds 32 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 32. 2 of them are nominal $1 street-space or sidewalk permits.