750–754 Pacific Avenue
Chinatown · San Francisco, CA 94133
Permit history
-
Sep 1982
Building use: house/retail.
-
Dec 1982
Additions alterations or repairs.
-
Jan 1983
Addition to work from permit 496472.
-
Nov 1984
Parapet safety work.
-
Mar 1993
Replace one wood door for bathroom.
-
Nov 1996
Reroofing.
-
Jun 1998
Remodel vacant store area for rental, install handica[ entrie.
-
Nov 1998
Seismic retrofit (phase 1)to install lateral frames on 1st/f.
-
Nov 1998
Renovate vacant store to be occupied by tung tai ginsing co.
-
Mar 1999
Do work base on complaint dated 3/2/99 complaint #199919525.
-
Jul 1999
Seismic retrofit-resident rm, install shear/tension bolts, alt.
-
Aug 2001
Install 4 new bathrooms 2 sets of laundry equip for 2nd &3rd floor rooms.
-
Nov 2001
Addition work for parapet safety during umb seismic retrofit under approved app 9823972.
-
Dec 2001
Revision to app #200111022409 to use steel plate in lieu of 2x10 wood beam.
-
Jan 2002
Revision to 200112195631: install steel plate beam spanning 16' a vertical brace shown in the interio.
-
Jun 2003
Install a fire sprinkler system to protect the residential portion of the building to comply with ord.
-
May 2004
Add communication panel to exist fire alarm panel to supervise the newly install sprinkler system.
-
Aug 2006
New garbage passage from 3rd floor to 2nd floor.
-
Oct 2011
Comply with complaint # 201033586. to provide heat in habitable space.
-
Dec 2011
Tenant improvement of ground floor and no exterior work. mep under separate permit, remodel existing bathroom.
-
Jun 2013
To comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 2nd floor - 2 bathrooms; 3rd floor - 2 bathrooms. misc. in-unit bathrooms both floors.
-
May 2024
Upgrade existing fire alarm include manual pull stations & smoke detectors. existing bells replace with horn/strobes. units to have 520hz low-frequency audibles installed. fire alarm control panel shall be monitored with starlink 24v call gms-sole path communication.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update