916 Pacific Avenue
26-unit apartment building · Chinatown
-
September 27, 1916
A permit was sought for a three-storey and basement frame apartment building, estimated at $16,000. J. Sokolov was named as superintendent and contractor.
-
1917
Built.
-
Jan 2000
Install foundation bolts at four foot centers min embedment 7".
-
Jan 2010
Comply with his nov #200921701 & 200923749 dated 9/25/09 & 10/12/09, restore as it legal use as a commercial space use, remove ekitchen cabinets & counter and return to open area.
-
Feb 2017
Markoff structural termite report # 16660, item #1, 2, 3, 4, 5, 6, 7; all repairs will not affect egress. substructure. n/a maher.
-
Feb 2017
Remodeling existing one unit - kitchen and bathroom; no walls will be added or moved; add washer/dryer in existing hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensor.
-
Feb 2017
Remodeling existing one unit - kitchen and bathroom; no walls will be added or moved; add washer/dryer in existing hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensor.
-
Aug 2017
Reroofing.
-
Oct 2017
#16 - full apt remodel; kitchen, bathroom; no walls will be removed or added.
-
Apr 2018
Renovate one unit like for like kitchen & bathroom replacement. add washer & dryer & install new reqire throughout unit. no new walls. maher na.
-
Jun 2018
One unit: 1)rehabilitate existing kitchen. 2)rehabilitate existing bathroom. 3)install washer and dryer. n/a for maher.
-
May 2019
Seismic stregthening in accordance with iebc appx a4. target story is ground floor. new wood shear walls, new moment frame, new grade beam commercial - i.
-
May 2019
Seismic stregthening in accordance with iebc appx a4. target story is ground floor. new wood shear walls, new moment frame, new grade beam residential - 201905019446.
-
Sep 2020
Upgrade the existing fire alarm system to comply with sffc 1103.7.6.1 and nfpa 72.
-
Oct 2020
0unit 19: rehabilitate existing bathroom & kitchen. install washer & dryer.
-
Apr 2021
# 19: no new wall and no existing wall relocation. plaster fell during demolition of kitchen/bath replacing it with new drywall at living room and bedroom approx 550 sq ft. new sheetrock shall be 5/8" typex gypsum board. revision to app#202010297761.
-
Jul 2021
One unit. replace bath tub, same location, replace washer & dryer. same location. upgrade line. dryer shall comply with cmc 504.4 and 502.2.1.
-
Dec 2021
#21: rehabilitate existing kitchen, existing bathroom, install washer/dryer.
-
Mar 2022
One unit: add non-load bearing partitions. rehab existing kitchen & bathroom rehabilitation. install washer/dryer.
-
May 2022
One unit: rehab existing ktctchen & bath. install washer & dryer.
-
Nov 2022
One unit: rehabilitate existing kitchen and bathroom. install washer and dryer.
-
Mar 2025
To comply with #7 of nov 202431434. install missing wood guardrail on section of stairs leading to roof on the interior stairs. new section will be painted. not visible from st.
2 cancelled permits are omitted.
Nearby
- 914 Pacific Avenue Same street
- 917–919 Pacific Avenue Same street
- 1309–1315 Powell Street Same block
- 1321–1327 Powell Street Same block
- 942–948 Pacific Avenue Same block
- 827–831 Broadway Same block
- 1230–1234 Powell Street Around the corner
- 43–47 John Street Around the corner