  1. 1906

    Built as a tenement and later converted to apartments; the city's survey uses it to illustrate that change of use.

    North Beach Historic Context Statement, adopted 2022
  2. Aug 1992

    Repair & install wood siding.

    Expired Permit 9213867 $$$ $800
  3. Jan 1993

    Repair fire damage(no struc.work), walls gypsum/replace ceil.

    Complete Permit 9301429 $$$ $20,000
  4. Feb 1993

    Replace fire damaged hood at kitchen with new exhausted system.

    Complete Permit 9302831 $$$ $15,000
  5. Aug 1993

    Install fire suppression system.

    Complete Permit 9313071 $$$ $1,500
  6. Feb 1999

    Repair stairs-up to 50 percent only, not replace.

    Complete Permit 9903043 $$$ $3,800
  7. Feb 2002

    Street space/sidewalk repair.

    Expired Permit M18903 $$$ $2,000
  8. May 2004

    Barrier removal & accessible upgrade on both bathrooms & entrances.

    Complete Permit 200405184147 $$$ $40,000
  9. Jun 2006

    Renew app #200405184147 for final inspection.

    Complete Permit 200606123809 $$$ $1
  10. Jul 2012

    1. replace existing hood canopy with new stainless hood canopy. 2. install (1) new hand sink, replacement existing 3 compartment sink.

    Complete Permit 201207195282 $$$ $10,000
  11. Jul 2012

    Upgrade fire suppression system to ul 300.

    Issued Permit 201207255780 $$$ $5,000
  12. May 2015

    Per nov 201539331; repair damaged by fire about 200 sq ft. on external wall @ rear of building.

    Complete Permit 201505055428 $$$ $5,000
  13. Sep 2015

    Soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. seismic retrofit. ada upgrade @ the entry on ground floor only. ** maher: compliance with ordinance no# 155-13 not required **.

    Issued Permit 201509157040 $$$ $100,000
  14. Sep 2020

    Revision to permit application 201509157040. revised shear wall at grid line e.

    Issued Permit 202009244918 $$$ $2,000
  15. Mar 2021

    One unit: interior remodel of kitchen, bathroom, add a bathroom. on 2nd fl.

    Cancelled Permit 202103176758 $$$ $58,000
  16. May 2022

    Install drywall in bathroom.

    Cancelled Permit 202205093831 $$$ $8,000
  17. May 2022

    One unit: one partial bathroom remodel: new prefabricated shower pan and shower door. new stone in shower enclosure. replace old dry rotted wood studs on on sidee of a wall.

    Complete Permit 202205114013 $$$ $6,000
  18. Sep 2024

    To revise permit application 201509157040: showing ada door to setbarck from e) 2'4" to n) 5'4" inside the building & swing outward.

    Issued Permit 202409191213 $$$ $5,000
  19. Dec 2024

    Upgrade existing fire alarm system to comply with sffc section 1103.7.6.1.

    Complete Permit 202412237348 $$$ $30,900
  20. Mar 2026

    Revision to permit application 201509157040: revise layout of accessible doors. install power door in the front door. ref 202409191213.

    Issued Permit 202603208027 $$$ $8,000
  21. Aug 2026

    Interior remodel in the 2nd floor on existing unit.

    Filed Permit 202608126481 $$$ $40,000