1443–1449 Powell Street
35-unit apartment building · Chinatown
-
1911
Built.
-
September 12, 1911
F. C. Amoroso and P. Casella contracted to put up a three-storey frame rooming house.
-
January 6, 1975
The Board of Permit Appeals overruled the Department of Public Health's denial of a permit for a food warehouse at 1447 Powell Street, with conditions requiring rat-proofing and installation of a sprinkler system.
-
Jan 1983
Additions alterations or repairs.
-
Mar 1986
To bring building into full complian if with the provisions.
-
May 1998
Living rm-all rms, painting, remove nailed shelvings from wall.
-
Jun 2001
Renew appl#20000107503 remove illegal unit, kitchen, fixtures, sinks, cabinets, stove, refig. in bas.
-
Aug 2007
Interior remodel of 2 storefront (both vacant) into one medical office, replace store fromt windows & doors for a new look with tile finish. install new ramp within space to comply with access requirement.
-
May 2013
To comply with ordinance 029-13 only: installation of grab bars in sro at the following location: 1449 powell street - 2nd floor, (4) grab bars in (2) large toilet room, 3rd floor, (4) grab bars in (2) large toilet room. 2nd floor (4) grab bars in (2) narrow showers; 3rd floor (4) grab bars.
-
Jul 2016
Comply with nov #201625452 two units -replace kitchen cabinet, bathroom vanity, tiles, one unit -replace vanity tiles, repair drywall in kind, paint interior, replace floor. replace tile in 4 bathrooms, 2 kitchen cabinet on hallway. no walls moved, removed, added or infilled. all layouts to remain.
-
Feb 2017
To comply with nov #201614823: install grab bar at hallway showerooms/bathrooms.
-
Nov 2017
Residential -soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. (commerical permit application 201711133834.
-
Jul 2018
Room 3, 5, 26, 30. new drywall, electrical rewire, sink replace. vent add one light to cmply with nov# 201880811. room 24 new drywall, electrical rewire, replace toilet bath tub and sink. room 25 new drywall, replace 3 kitchen cabinets, replace bath fixtures and electrical rewire.
-
Jun 2022
Remodeling of kitchens on 2nd and 3rd floors in cluding replacing cabinets, countertops, hood, cooktop, flooring, lighting and plugs. one unit renovations kitchen and bathroom. replacing 15 doors. no exterior changes.
-
Apr 2023
To compy with nov #202303583, build 2 walls to create two separate rooms from the existing meeting room, reconfigure space and counter tops to include an office & file storage. not residential guestrooms.
-
Jan 2024
Complying with nov# 202303750: installing handrails interior.
-
Jul 2024
Complying with nov 201644842, 201880811 and 202069111. restoring unwarranted habitable rooms at rear of commercial space on 1/f including bathrooms and kitchen to storage and removal of plumbing fixtures for kitchen and fixtures.
-
Sep 2026
To comply with complaint 202661972, 202661464, & 202658590: repair front window; misc. siding repair; replace cabinets, counter tops, & fixtures for 2 kitchens; & replace doors, including 20 min. rated doors for guest rooms. no work on ground floor.
4 nominal $1 street-space or sidewalk permits are omitted from the timeline. 7 expired or cancelled permits are not shown.
Nearby
- 1441 Powell Street Same street
- 1450 Powell Street Same street
- 1455–1461 Powell Street Same block
- 821–825 Vallejo Street Same block
- 837–841 Vallejo Street Same block
- 1463–1465 Powell Street Same block
- 810–822 Vallejo Street Around the corner
- 828 Vallejo Street Around the corner