1106–1112 Stockton Street
Chinatown · San Francisco, CA 94133
Permit history
-
Mar 1984
Provide 2 largers of 5/8" typex sheet rock replace exist.
-
Nov 1984
Parapet safety work.
-
Oct 1987
Clean site remove fire debris (for emergency work).
-
Nov 1987
Fire repairs to exist building incl penthouse office.
-
Jan 1990
Restucco front side of the building.
-
Jan 1995
Construct 2 handicapp toilets tooms, new cashier counter.
-
Feb 1995
Remove existingstorefront & doors, install new metal roll grilles.
-
Jul 2005
Reinstall store front to existing location per plan to comply with nov 200559885.
-
Jan 2010
Remove dry wall at sub-basement ceiling approx. 30 sq ft. for health & building department inspection only. replace sheet rock under separate permit. supermarket shall remain vacant.
-
Jan 2010
Repair and replace damage interior wall approx. 40 sq ft. replace floor tile required by the health dept, add new prep sink & hand sink.
-
Oct 2012
Repair existing toilet in existing market to become accessible toilet. replace existing toilet hand sin and floor tile with 3/8" radius cove tile base min 6" up to existing walls. to comply with complaint #201269303.
-
Jan 2014
Legalize walk-in cooler at 2nd floor per dartment of health's requirement.
-
May 2024
To comply with awning amnesty program legalize existing awning.
-
May 2025
Ground floor for existing sheetroock to be removed and restored with 1-hour fire-rated at property line and new ada bathroom. ground floor wall approximate 60'x10'h.
-
Jun 2025
Replace existing plywood with new plywood in the first floor and add new concrete footing in the basement level.
-
Oct 2025
T.i. to e) retail building, ref to 202505217007 for structural & restrooms. new storefront with windows at ground/f, new finishes, plumbing, equipment & walk-in coolers, no additional area proposed, electrical/hvac/sprinklers under separate permit.
-
May 2026
Revision to permit application 202506249362 replace existing slab with new concrete slab in the basement level.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update