933–949 Stockton Street
Chinatown · San Francisco, CA 94108
Permit history
-
Oct 1982
Building use: dwg.
-
Jun 1989
Remodel existing offices at g/f new handicap bathroom.
-
Jun 1990
Kitchen remodeling.
-
Aug 1993
Proposed new restaurant to existing ground floor.
-
Mar 1997
Remove interior partitionsnew full service restaurant in ret.
-
Oct 1997
Fire damage repairs.
-
Dec 1997
Repair fire damage to grocery store, add sanitary fac, new frt.
-
Mar 2002
Tenant improve in barber shop, replace store door in kind.
-
Mar 2002
Street space.
-
Apr 2004
Umb seismic retrofit by bolt plus procedure including installing steel lateral ressisting frames to.
-
Dec 2007
Proposed a new beauty salon at existing ground floor (change existing retail into new beauty salon).
-
Apr 2012
Erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton street.
-
Oct 2012
Demolition of one commercial building for central sub-way.
-
Jul 2015
B/f - zypex interior walls - waterproofing; epoxy inject interior wall; replace dirty tile on ceiling with new ones.
-
May 2016
Revision to permit application 201204037405, addition of plaza level on top of existing (currently under construction) transit station. ref permit application 201204037405.
-
Jan 2017
Install new fm-200 clean agent fire suppression system. ref. #201204037405.
-
Jun 2017
Ref #2012-0430-7405 (general contractor permit #) provide (2) customer built deluge panels.
-
Dec 2017
Pre-action system, deluge system, wet systems standpipes.
-
Oct 2018
Provide a new fire alarm system @ the new chinatown light rail station. permit number: 2012-0403-7405.
-
May 2022
Selective demolition and new construction of selective demolition and new construction remodel of existing tenant space with new doors, windows, equipment finishes and storage casework, new lighting fixtures and power outlets, new sink & hvac registers.
-
Oct 2022
Fire as built for permit application 201701177247. revused sequence of operations matrix for addition of the traction power emergency power off (epo) control. add 2 addressable input modules for epo status monitoring, 1 addressable output module for epo trigger.
-
Jan 2023
Revision to permit application 201810233853. provide a modification of the existing fire alarm system. add (3) new led ceiling speaker/strobes.
-
Aug 2023
Add 3 pendent sprinklers under new soffit in sfpd down rm.
-
Aug 2024
Demolition e) banner, scraped & cleand for art installation. furnished install all req steel backing assembly. furnish/ install air barrier/waterproofing. glazing installation (glass artwork). furnish scaffold for entire project. (scaffolding under separate permit).
DBI holds 45 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 45. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. The roll classes this parcel as a vacant lot and also gives it a build year of 1906. Submit an update