2501–2585 3rd Street
Dogpatch · San Francisco, CA 94107
-
Sep 1987
Industrial/parking.
-
Jul 2008
Demolition existing walls for new openings with windows, add interior foundation & new walls, new concrete floor slab, new storefront to include two new windows & two accessable doors.
-
May 2011
Build new brewry & restaurant with mezzanine @ former cafe/warehouse space. sprinkler modification & ansul system under sep. permit. mechanical/electrical/plumbing permits to be pulled separately.
-
May 2012
Tenant improvement for ground floor, change of use from warehouse to museum. construction of glass storefront system, platform infill and stair at entry, construct interior wall partitons, plumbing and electric work and modification to existing mechanical. fire sprinker separate permit.
-
Nov 2012
Interior renovations to make an indoor rock climbing gym, included will be building walls, mens's and womens restrooms with lockers and showers. new accessible entry and storefront on 3rd street. new ventilation mechanical for restrooms and general open space.
-
Mar 2015
All work is interior demolition: existing restroom and office, remodel includes new glass roll up door to replace existing metal door. new accessible restrooms, new program rooms for climbing, new climbing walls. new lighting, new hvac, new plumbing. n/a for maher.
-
Dec 2015
At&t wireless facility - installation of unmanned wireless facility on rooftop. fully screened on the south west corner of the building. screen wall painted to match. support equipment and (4) antennas per sector behind screen wall. no height increas is proposed. maher na.
-
Mar 2018
Renovation of existing tenant space for the purpose of wholesale food production and accessory retail use (not exceed 10%). mep deferred. n/a for maher.
-
May 2018
Remodel existing restaurant to include new exhaust head, equipment and sheathing, remodel new beer garden with seating with associated plumbing, mechanical and electrical.
-
Feb 2019
Interior work to add ramp to loading dock to existing manufacturing space. new storefront beyond facade. new roll up door. new accessible restroom. floor level change and minimal foundation work. removal of curbcut on 22nd st/illinois.
-
Mar 2019
Interior ti for a grocery store (mainstay market). new storage mezzanine. health review deferred. grocery store t.i. under sep permit.
-
Apr 2019
One unit - installation of a commercial kitchen on the 2nd floor. mep deffered no exterior work.
-
Jul 2019
Remove loading dock, install ada ramp, new mail room. new storefront.
-
May 2020
Removal of 1 non-structural, metal framed sheet rock partition wall and 2 sides of non-structural metal framed sheets rock walls at bathroom. no further demolition work. all work performed in one unit. building is asbestos free. sprinkler under sep permit.
-
Sep 2020
Modifying as existing manufactoring and distribution spaceinto a food processing facility and retial store. install new walk-in coolors and freezer. no exterior changes proposed.
-
Apr 2022
Modifying an existing manufactoring space into a food production facility with walk up window.
-
May 2022
Renovation of existing brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work.
-
Jun 2022
Modify an existing manufacturing space into a limited restaurant/ to go kitchen. no publuc access to space.
-
Jul 2022
Mechanical, electrical, and plumbing work for approved permit application 202205063728.
-
Apr 2023
Ste #320 installation of self contained cooking units for the preparation of pet food. ada restroom upgrade. change of use from light manufacturing to light nanufacturing no overnight pet boarding.
-
Apr 2023
Remove existing gravel 2) install rigid insulation 3) install fully adhered tpo roof membrane 900 sq ft.
-
Sep 2023
Verizon install (9)new antennas (3) sectors, (12)new radio units in (3) sectors, all sectors will be screened by frp to match building, (4)new surge suppressors, (1) meter panel in existing electrical rm, (1) step down transformer, 1 ppc distribution panel, 3 new hybrid cables 1 per sector, 1 gen plug, 1 gps.
-
Feb 2025
#322: vacant industrial tenant space to be converted into an industrial kitchen and prep facility.
-
Mar 2026
Two units: expansion of commercial kitchen facility including: cookline with hood, plumbing, finishes.
-
August 25, 2026
Local Chocolatier to Open Culinary Institute In SF’s Dogpatch — SFist
DBI holds 188 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 188. 17 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update