Blinn Estate Building
300–310 Brannan Street
-
1912
Built.
-
1912
The Blinn Estate Building, one of the largest and most architecturally significant Mission Revival warehouses in the South of Market Area.
-
March 21, 1912
George H. Stoffels contracted for all work except sprinkler system and spur track on a six-storey building, then going up, at $54,130.
-
Jan 1983
Conform to codes.
-
Jul 1985
Addition of 2500 sq ft 2nd fl, tenant imp. 1st & 2nd floors.
-
Dec 2006
Reroofing.
-
Apr 2007
Remove existing sprinkler riser and install a new 6" riser with floor. isolation risers. we will also install a new fire pump.
-
Sep 2007
Underpinning of 2 perimeter columns for structural enhancement for pg&e vault installation in sidewalk adjacent to columns. this is a revision to permit application 2006/08/14/9337.
-
Apr 2008
Demolition and construction of full height partitions, supspended ceilings/lights, new exterior door (replacement) for hc access at ground floor location. mep on sep permit.
-
Mar 2012
Barrier removal work only. demolition of existing toilet rooms and corridors including partitions and associated electrical. construction of new accessible toilet rooms including floor to deck partitions. associated disable access upgrades. mep separate permit.
-
Apr 2013
Barrier removal to expand existing unisex bathroom on 3rd floor to upgrade to ada standards, removal and relocation of one concrete wall opening to create an acussible path to bathrooms finishes and lighting placement, addtion of exit signs. mep under separate permit.
-
Jan 2014
Renew for final 201206182822. all work is complete.
-
Mar 2014
Barrier removal to demolition existing toilet rooms and corridor partitions to construct new accessible toilet rooms and a new shear wall partition. na ordinance #155-13.
-
Apr 2014
Demolition and cosntruction of partitions and doors to upgrade existing restrooms to ada compliance. existing fixtures and accessories to be relocated only. addition of rated parition for elevator shaft enclosure. mep and fire sprinklers/alarms on sep permit at required.
-
Jan 2015
5th floor - demolitoin of existing toilet room & corridor including partitions + associated electrical. construct new accessible toilet rooms, floor to deck partitions, new partition to enclose tel. closet, new lighting & associated power, associated life safety system changes & disabled access upgrades.
-
Jan 2015
1st floor suite 101 - demolitoin of existing full height paritions, construction of new full height partitions, associated electricalp/power distribution, associated mechanical system distribution, associated life safet changes & finsihes. n/a maher ordinance.
-
Apr 2019
Construction of non rated partitions, asciated electrical, plumbing, life safety and finish upgrades.
-
Mar 2022
Ground floor: barrier removal, restroom upgrade. demolition of existing partitions, construction of new partitions, plumbing fixtures, associated mechanical and electrical.
-
Mar 2022
Infill pit at the corner of the ground floor commercial space. g/f retail of use remained, ti works under separate permit.
-
Aug 2022
Tenant improvement for new vetrinary clinic. new electrical, plumbing, walls, finsihes, ducting.
DBI holds 97 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 97. 5 of them are nominal $1 street-space or sidewalk permits. 8 expired permits are not shown.
Nearby
- 275 Brannan Street Same street
- 301 Brannan Street Same street
- 326 Brannan Street Same block
- 17–19 South Park Same block
- 21–29 South Park Same block
- 334 Brannan Street Same block
- 634–636 Second Street Around the corner
- 601–615 2nd Street Around the corner