Permit history
-
Feb 1983
Additions alterations or repairs.
-
Mar 1983
Additions alterations or repairs.
-
Apr 2013
Interior/core rehab of existing & accessibility element, including: new elevator, two exit stairs, improved lobby & stair, new accessible restrooms. mep, sprinklers under separate permits.
-
May 2013
Change of use-2, 3, 4 fls to office fr. industrial. renovation of exterior including newentrance & aluminum windows in existingopening @ portions of 1st & 2nd fl, construction of occupied roof, mechanical enclosure, & extension of stairs & accessible elevator to serve roof deck.
-
Jan 2014
Seismic strengthening per chapter 34 of san francisco building code 2013, part of permit application 201304265541. ** maher: compliance with ordinance no# 155-13 not required **.
-
May 2014
Install a new complete fire sprinkler system throughout per nfpa #13. install new standpipe system per nfpa #14. existing 6" underground. full coverage with 556 sprinklers.; compliance with ord 155-13 not required.
-
Jun 2014
Revision to permit application 2013-0426-5541. install new vrf heat pump systems (9 total) with branch selectors and referigerant piping corrected. install fresh air make up and exhaust system. n/a maher ordinance # 155-13.
-
Nov 2015
Full floor t.i. incuding non-structural demolition and construction of partitions, interior finishes, doors, casework, light fixtures, and plumbing fixtures. life safety and sprinklers under separate permit.
-
Dec 2015
Interior improvements to 1st floor. interior wall additions and cleaned up finishes. n/a for maher.
-
Dec 2015
Full floor tenant improvement including non structural demolition. construction of non structural partitons, , interior finsihes, doors, casework, light fixtures, plumbing fix. l/s, fs sep permit.
-
Dec 2015
3rd floor: full floor including mezz ti including non structural demlition, non structural partitions, interior finishes, doors, casework, light fixtures, plumb fixt, life safety, fire sprnkler sep permit.
-
Mar 2016
3rd floor: full floor tenant improvement including non structural demolition, construction of non-structural partitions, interior finishes, doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit.
-
Mar 2016
2nd floor: full floor tenant improvement including non structural demolition, construction of non-structural partitions, interior finishes, doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit.
-
Mar 2016
4th floor full floor tenant improvement including non-structural demolition, construction of non-structural partitions, interior finishes, doors, casework, light fixtures & plumbing fixtures. life safety & mep under separate permit.
-
May 2016
1st floor: install new fan coil. refridgeration piping and ductwork, ref pa 2015 1207 4275 maher na.
-
Jun 2016
2nd floor - installation of new fan coils & duckwork. ref permit application 201603162146. n/a maher ordinance.
-
Jun 2016
3rd floor - installation of new fan coils & duckwork. ref permit application 201603162144. n/a maher ordinance.
-
Jun 2016
4th floor - installation of new fan coils & duckwork. ref permit application 201603182423. n/a maher ordinance.
-
Jul 2016
Light demolition, 1 new conference room, 3 new doors.
-
Mar 2019
2nd/3rd: t.i. non structural remodel to include, but not limited to partitions, flooring, ceiling, furninshing, and finishes, no changes to other floors on building or existing egress path to street.
-
Jun 2019
Deferred mechanical plans dated 5-24-19 ref 201903114940.
-
Sep 2019
Modification of existing tenant improvement including new full height & partial height walls. new interior chain-link fencing. lighting upgrades, new cabinets at existing break areas.
-
Mar 2020
Interior ti of 2nd & 4th. non-structural ti to include, but not limited to partitions, flooring, ceilings, furnishings & finishes. no change to other floors in building or existing egress path to street. no food/beverage or third party catering to be provided by employer.
-
Jun 2026
Core & shell remodel to 2nd & 3rd & 4th floor. interior partition for offices & conference room in the future. new interior stair. electrical of plumbing & fire protections systems shall be submitted as deferred submittal by design - build contractor.
DBI holds 54 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 54.
Not yet documented: the architect and builder and the early tenants. Submit an update