98 Jack London Alley
East Cut · San Francisco, CA 94107
Permit history
-
Apr 1985
Interior partitions for office, floors, drains in sink area.
-
Jun 1985
Additional interior partitions.
-
Jun 1990
Reroofing.
-
Aug 1990
Const. new low partitions walls 2nd floor.
-
Feb 1993
Add blocks & straps per parapet plans.
-
Jun 1999
Tenant improvement and ada upgrade.
-
Oct 1999
Interior t/i renovate 1/f to create office & support space.
-
Feb 2000
Minor revision to app #9911901 minor changes to bathrms kitchen & relocate entrance door.
-
Sep 2000
Elevator replacement with ada compliance.
-
Jun 2001
Renew and final app #200002182256 and 200019161720 delete elevator lobby door at g/f and 2/f.
-
Feb 2008
Demolition floor finishes & limited non-bearing partition walls. refurbish bathroom & kitchen. new non bearing partitions. replace most lighting & fixtures. addition of some power distribution, relocate storefront.
-
Mar 2008
Ground floor - revision to appl #200802215270: to change location of sink in mens bathroom. forego demolition of existing shower.
-
Mar 2008
Change ground floor suite main entry designation from existing brannan entry to existing jack london alley entry. entry from brannan st. is not ada accessible & is the back door in relation to the tenant build-out. entry from jack london allen is accessible and is the front entry to tenant space on grd floor.
-
Mar 2008
Request a new street address for the ground floor suite only corresponding to the existing accessible entry on jack london alley.
-
Sep 2010
Reroofing.
-
Aug 2020
Property owner improvements to existing level 1 spec suite. selective demolition, construction of interior non-load bearing partitions, doors, sidelites, ceilings, lighting and interior finishes. minor accessibility improvments at spec suite enrty doors. mep scope deferred submittal.
-
Nov 2020
Ref. permit application 202008222445. lighting title 24 only.
-
May 2023
Establish office use per 2021-011143zad zoning administrator determination letter. renovate ground and 2nd floors. no work on 3rd floor. demolition of existing ceiling height partitions, new full height non bearing partition walls, cold form steel infill and glass guardrail attachments, mep deferred.
-
Aug 2023
Demolition: remove all non-structure interior walls and ceiling on the 2nd floor.
-
Dec 2023
Decommission and demolition of existing freight elevator. infill pit with new grade floor slab. establish and document wholesale sales use on the ground floor pursuant to the sq ft planning code.
-
May 2024
Barrier removal only -demolition ofpartitions, entry landing, g/f entry lobby & stair improvement & finishes, structural scope encompasses concrete infill & concrete stair at vestibule, stair stringer & glass guardrail attachment. associated ele/power/lighting distribution.
-
May 2024
2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mechanical system distribution, associated life safety system changes and plumbing. structural scope of work encompasses.
-
Jul 2026
2nd floor. replace existing heat pump with new. install 1-5 ton ducted heat pump and 1 -3 on 1 ductless split heat pump system. install new ducting. condensate drain to in let.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update