1155 Battery Street
Financial District · San Francisco, CA 94111
Permit history
-
Mar 1982
Additions alterations or repairs.
-
Aug 1983
Complete tenant build-out.
-
Apr 1998
Oti-1 1/f el me sp.
-
Apr 1998
Oti-2 1/f el me l/s.
-
Nov 1998
Oti grd floor, el, me & sp.
-
Aug 2001
Modify existing restrooms to meet ada complanie "at will". floors 2-7 & new ceiling tiles at corridor.
-
Apr 2002
Install new front end for fire alarm system.
-
Feb 2003
Install graphics/exhibits in main lobby (ref.: 200302288514).
-
Oct 2005
Oti-1, 6th floor, el, me, ls, sp.
-
Dec 2009
Floors 2, 3 & 4. scope of work is limited to interior non structural pre-construction demolition. this area is to remain unoccupied in accordance with sq ft ab-017.
-
Dec 2009
Tenant improvements floor 2 to 7. non-structural interior partitions & finishes for 289.719 sq ft. in existing levi strauss building. 7 story building with basement/ garage. project includes renovation of 6 floors of office & support space.
-
Aug 2010
Levi strauss. interior non struc.ti on ground fl only. work includes selective demolition and renovation, drywall clgs, finishes, mechanical, and electrical. approx sq ft; 32, 174 with retail shell enclosure. new showers and new 1-hr rated separation to create separate retail space. occup load verifiy under sep permit.
-
Nov 2010
Ground floor-new non-structural interior partitions, doors & millwork. new electrical, lighting & mechanical. no exterior work. remodel retail area at ground floor.
-
Sep 2022
2/f: t.i., new non-load bearing partitions, ceilings, lighting, mep, finishes, & casework. install of horizontal exit assembly.
-
Dec 2022
5/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep.
-
Dec 2022
6/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep.
-
Dec 2022
4/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep.
-
Dec 2022
3/f: ti: nonstructural partitions, restrooms, ceiling, fixtures, finishes. including mep. life safety deferred.
-
Jul 2024
1/f: interior tenant improvement includes new non-load bearing partitions, ceiling, lighting, finishes, and casework.
-
Dec 2024
Floor 1: removal of existing toilet stall, plumbing fixtures, ceiing, restroom accessories & all finishes. proposed: combine existing separated restrooms into a single all gender restroom with shared vanity. all new plumbing fixture accessories & full height partitions/doors & finishes.
-
Dec 2024
Level 1: demolition e) storefront, alter e) landscape. n) entry & storefront & landscaping with walkway & stair.
-
Jan 2025
Mechanical, electrical and plumbing work for ti on 1st fl. ref permit application 202407317680.
-
Mar 2025
Ground fl - interior tenant fit-out adjacent to existing public plaza. work includes interior partitions, wall fixture, light fixsture, electrical outlets. convert portion of office to accessory retail. resttroom and drinking fountain under bpa# 202501178624. electrical deferred.
-
Sep 2025
Reroofing (no hotworks).
DBI holds 189 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 189. 7 of them are nominal $1 street-space or sidewalk permits.
The statement gives Levi's Plaza as 1105 Battery Street, 1981 in three places and as 1155-1160 Battery Street, 1982 in its landscape chapter. Not yet documented: the developer and the early tenants. Submit an update