37.7998, −122.4014 A locator map appears here once a Mapbox token is configured.

901–911 Battery Street

Financial District · San Francisco, CA 94111

  • Built 1923
  • Office building
  • 4 stories
  • Zoned C2
  • District 3
  • Historic status: historic resource
37.7998, −122.4014 Street View appears here once a Google Maps embed key is configured.
92,465 sq ftBuilding area
18,906.25 sq ftLot area
40Rooms · 4 baths
  1. August 16, 1961

    The Office of the Assessor-Recorder photographed the property for tax assessment. Manning's Bakery was at the address.

  2. Feb 1982

    Additions alterations or repairs.

    Complete Permit 8200754 $$$ $70,000
  3. May 1987

    Tenant improvements, carpet, ceramic tile, glass, paint.

    Complete Permit 8705750 $$$ $124,938
  4. Mar 1988

    New partitions, acoustical, painting, electrical, plumb, demolition/hvac.

    Complete Permit 8802538 $$$ $125,000
  5. Sep 1997

    Cti 2l me 1st fl.

    Complete Permit 9719345 $$$ $250,000
  6. Oct 1997

    Cti-2.

    Complete Permit 9721948 $$$ $150,000
  7. Jul 1998

    One-stop, mechanical dwgs, t-24, hvac, demolition, piping/wiring.

    Expired Permit 9814195 $$$ $200,000
  8. Aug 2006

    Remove and replace supply fan and ductwork on roof only. chiller and storage tank under separate permit.

    Complete Permit 200608149379 $$$ $150,000
  9. Sep 2006

    Remove/replace existing mechanical rooftop equip. install new chiller, pumps & storage tank. supply fan & rooftop ductwork under separate permit.

    Complete Permit 200609283588 $$$ $150,000
  10. Jun 2013

    Voluntary seismic upgrade. accessibility upgrade of existing common restrooms. improvements of two building entry lobbies. teixant spaces maintenance upgrades.

    Complete Permit 201306210207 $$$ $1,300,000
  11. Aug 2013

    Voluntary structural strengthening. construction of foundation for one interior steel braced frame and one interior shear wall.

    Complete Permit 201308053557 $$$ $175,000
  12. Dec 2013

    Non structural t.i. walls for office and conference rooms, add unisex bathrooms, open office improvements.

    Complete Permit 201312194576 $$$ $850,000
  13. May 2014

    Mep for 201312194576.

    Complete Permit 201405145766 $$$ $50,000
  14. Aug 2018

    Demolition of non structural partitions, ceiling assembles, doors, frams, hardware, lighting, electrical, millwork, plumbing and finishes. build back of accessible restrooms including non structural paritions ceiling assemblies, doors, frames and hardware. no increase in area, change of use. mep/life sep.

    Complete Permit 201808106985 $$$ $215,706
  15. Mar 2019

    Build back accessible restroomsincluding non structural partitions, ceiling assemblies, doors, frames, hardware, lighting, electrical, plumbing finishes in empty tenant space. no structural work and no change in use, area or occupancy. mep included.

    Complete Permit 201903266262 $$$ $460,351
  16. Apr 2019

    Revision to permit #201808106985, change restroom orientation to reuse existing plumbing chase plus add, full mep engineering. 2nd fl.

    Complete Permit 201904107556 $$$ $553,321
  17. Jun 2020

    Interior tenant improvement including new non-structural partitions, lighting, plumbing, finishes, and millwork. voluntary addition of new sprinklers to 4th floor. no change in occupancy, use, or area.

    Complete Permit 202006088251 $$$ $1,327,955
  18. Sep 2020

    4/f: t.i., add (247) sprinklers & main lines and fittings to conform to new wall/ceiling layout of the t.i. ref bpa#202006088251.

    Complete Permit 202009265135 $$$ $130,000
  19. Jan 2021

    4th floor - electrical work for ti. ref pa 2020-0608-8251.

    Issued Permit 202101062182 $$$ $20,000
  20. Jan 2021

    4/f: mechanical & plmbing for t.i. on 4/f. ref t.i. permit application 202006088251. maher n/a.

    Complete Permit 202101223173 $$$ $120,000
  21. Sep 2021

    Suite 100: interior t.i.: new millwork, finishes, non-structural partitions, light fixtures. mechanical and electrical included. fire/life safety and sprinkler under sep permit. maher n/a.

    Complete Permit 202109017560 $$$ $750,000
  22. May 2023

    3/f: t.i. includes demolition of non-structural partitions and building new non-stru partitions. all new or revised mep's, sprinklers & alarm life safety work will be designed build and submitted separately (building is fully sprinklered) as part of scope.

    Complete Permit 202305177916 $$$ $600,000
  23. Jun 2023

    3/f: installation of new fire sprinkler system; rlh scope of work starts at the existing top of riser located in stair 1 (st1-3) ref pa 2023-0517-7916.

    Complete Permit 202306270898 $$$ $64,000
  24. Jul 2023

    3/f: mep add branch ductwork and required vavs to new hvac zones, ddc system to be added to the floor, providfe new lighting & power to existing circuit. ref permit application 202305177916.

    Complete Permit 202307101734 $$$ $1,200,000
  25. Aug 2024

    Abe ord 51-16 accessible building entry upgrades, relocate door actuator to front facade, exterior sidewalk upgrades. abe 20200492108.

    Issued Permit 202408088219 $$$ $147,000
  26. Dec 2025

    1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes.

    Complete Permit 202512111590 $$$ $1,000,000

DBI holds 82 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 82. 9 of them are nominal $1 street-space or sidewalk permits.

Not yet documented: the architect and builder and the early tenants. Submit an update