Mar 2000
Reroofing.
-
Feb 2001
Seismic retrofit of unreinforced masonry brick building -bolts plus.
-
Aug 2001
Street space.
-
Jun 2006
Reroofing.
-
Jul 2007
3 fabric awnings.
-
Mar 2009
Replace ext non u l 300 ansol with new u l 300 approved ansul.
-
Apr 2014
Emergency repair structural wood beam at 1st floor.
-
Dec 2014
Underpinning for 350 bush shoring reference permit application 201410219486.
-
Sep 2017
Basement- removal of existing brick retaining wall and new support post. all work in basement.
-
Oct 2017
Demolition non structural interior partitions, ceilings, lighting, doors, frames, hardware and millsork finishes.
-
Dec 2017
Expansion of existing restaurant into adjoining space, construct new bar in adjoining space, new accessible restrooms, expand existing kitchen, expand basement, new fire sprinklers throughout.
-
Dec 2017
2nd floor: new construction of non-load bearing walls. installation of doors, frames, hardware, interior glazing, lighting, and finishes typical of an open office environment.
-
May 2018
New underground 20' total length from cwm to riser.
-
Jun 2018
Replace existing aluminum windows at south elevation with new aluminum windows. replace glass in existing door. repair fan over entrance door. reference permit 201712065620.
-
Aug 2018
Revision to permit application 201712277494, revision to interior layout of new construction of load and non-load bearing walls, installation of doors, frames, hardware, interior glazing, lighting and finishes. 2nd fl.
-
Sep 2018
Install ul300 fire system, ref 201712065620.
-
Sep 2018
Install 1 hour fire rated lobby and 1 hour fire rated door at bottom of stairs in basement. install early fire detection alarm in basement install 3" fire hose valve at top of the stairs and make existing fire chase accessible. all of the above is agreed as per ab005 with reference to app#201712065620.
-
Sep 2018
1st & 2nd fl - new fire sprinkler system 162 added sprinklers. ref pa 2018-0919-0819.
-
Oct 2018
Install 1 double faced projecting electric sign "sams tavern".
-
Oct 2018
2nd floor. tenant improvement to incl new hvac system, restroom ventilation and electrical work. ref 201808137130.
-
Nov 2018
Installation of a new sprinkler monitoring system and smoke detectors to cover basement area. ref pa 2018-0919-0819 and 2018-0924-1120.
-
Feb 2019
Revision to 201810112893 structural attachment revision.
-
Jun 2023
Tenant improvements - existing fire sprinkler system 4 new sprinklers.
-
Oct 2023
Sam's grill: attach a pre-fabricated outdoor patio to a steel ledger at side of building.
DBI holds 32 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 32.
Not yet documented: the architect and builder and the early tenants. Submit an update