Mar 1982
Additions alterations or repairs.
-
Dec 1989
Emergency repair due to damaged.
-
Aug 1992
Renovate grnd floor lobby & mezz-newfinishes, lite fixtures+++.
-
Sep 1998
Oti-1 el me ls sp 22/f.
-
Oct 2000
Structural steel & framing supports for chiller & cooling tower replacement project as per degenkolb.
-
May 2002
Oti-1 3rd floor, el, me, ls, sp.
-
Apr 2004
Oti-1, 21st floor, el, me, ls, sp.
-
Jul 2004
Oti-1, 12th floor, el, me, ls, sp.
-
Nov 2004
Oti-1 18th floor el me ls sp.
-
Mar 2013
20th floor-demolition of partitions, ceiling & finshes. new partitions, ceiling, finsihes, electrical, data outlets & panels. mechanical units, duct work, plumbing at breakroom. fire alarm and sprinklers separate permit.
-
Jul 2015
Improvements to exterior hardscape, landscape & lighting, increase floor area on floor 22. install skylite. floor 22 is enclosing an existing deck.
-
Jan 2016
21st floor: interior tenant improvement incl. drywall, millwork, ceilings, minor demolition, doors & finishes; mechanical & electrical under separate permit.
-
Jan 2016
22nd floor: interior ti - drywall, millwork, ceilings, doors & finishes. new shaft at elevator lobby & mep under seperate permit.
-
Apr 2016
Replace vent of 3 air handing units.
-
Jan 2017
#1900- new work consists of limited demolition & new ceiling height partitions, doors, frames and hardware, millwork, power/data, finishes and of ada restroom in the elevator lobby, space is currently unoccupied. mep include. any alteration to sprinkler & life safety system will be under seperate permit.
-
Sep 2018
Hvac: replace 17 double duct and 7 cooling vavs. replace diffusers. install 1 new cooling vav and change pneumatic controls to ddc. electrical. new lighting, outlets, switching. ref. permit application 201806262955. maher n/a.
-
Feb 2019
Minor demolition e power, ceiling accessories, tiles. new partitoins, door/frame/hardware, millwork, power data, finihses, lighting, new w hr rated ceiling enclosure assemblies 4th fl. mechanical transfer ducts, new mechanical, struct celing framework. renovate restrooms, elevator lobby.space is vacant. mep, sprink, ls.
-
Dec 2019
20/f: interior t.i. including drywall, millwork, finisehs, ceiling, lighting, plumbing, eletrical & mechanical. maher n/a.
-
Jan 2020
Ste 702 - demolition of existing partitions, ceiling tiles, lighting, finishes & millwork. new work consists of existing partitions, partial salvaged & new doors, frames & hardware, millwork, poiwer/data, finishes & ligyting. any alteration to mep, sprinkler & life safety systems will be under separate permits.
-
Jan 2021
Reroofing.
-
Jul 2022
18th fl: new partition, millwork, and finishes. new ceilings and lighting. mep deferred.
-
Oct 2024
20th floor: finishing shell- condition elevator lobby; extending lobby with alcove for new drinking fountain; building new single-accomdation gender neutral restroom; finishing shell-condition core restrooms. any alteration to mep, sprinkler and fls systems to be under separate permit.
-
Dec 2024
14/fl- oti demising a vacant suite. minor demolition followed by construction of meeting rooms, break area copy etc build out includes new non rated partitions, doors, frames, hardware, power/data casework/plumbing, ceiling/lighting, and new finishies throughout. any alteration to mep, sprinkler or fls.
-
Jan 2025
20/fl-build common corridors and suite entries to demise an unoccupied floor and build out one suite. suite constructon consistsof office, meetings rooms, workstatoins, break area phone rooms, etc. all new power/data, casework, acoustic ceiling, finishes etc throughout. mechanical included. elc deferred.
-
Apr 2026
8th fl - office ti minor upgrades to existing vacant suite: unpdating break area casework, appliances & flooring. new lighting throughout: new cavinet throughtout. updates to power/data. existing improvements & finishes to otherwise remain, including ceilings. existing occupancy does not change. alterations.
DBI holds 910 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 910. 16 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update