250 Clay Street
Store building · Financial District
-
1967
Built.
-
Mar 1982
Additions alterations or repairs.
-
Aug 1992
Epc- install water-cooled liebert unit for communications rm.
-
Oct 1993
Title 24-alter, 15th floor-correct path-2 new smoke doors.
-
Sep 1994
Install new driveway for ins vehicle.
-
Jun 2004
Construct telecommunications facility including 2 radio equipment cabinet mounted on garage wall @.
-
May 2005
Soft demolition of inteior components per demolition drawning & removal of all dabres to accomioath.
-
Jun 2005
Oti-2, 1st floor, el, me.
-
Jun 2005
Oti-1, 1st floor, el, me, ls, sp.
-
Oct 2008
Fire sprinkler monitoring system-all work done on partial ground level.
-
Nov 2010
Demolition of pedestrian bridge, install fence to match existing fence.
-
May 2013
Demolition of non-structural partition, construction of new non-structural partitions and finishes, mep, life safety and sprinklers under separate permit.
-
Oct 2014
Replace existing exhaust fans and supply fans for the garage and install carbon monoxide sensors.
-
Mar 2016
Att telecom modification, r/r 6 e antennas with 6 new antennas, 2 new rrus- w a2, install 2 new rrus 32, install 2 new dc6, 2 new rrus-11 @ equipment, new dc 12, r/r e dvl with new dvs 41, install 4 new 7/8" coax in 2 new conduits, remove e dc6 from e rba72, new antennas, surge suppressors, antenns.
-
Jun 2017
Electrical works associated with the replacement of parking access and revenue control system (parcs) equipment for the garage. parcs equipt not part of this application.
-
Jan 2019
Minor lighting upgrade, minor lighting control upgrades, minor power upgrades, occupancy sensors and automatic time switch controls.
-
Dec 2020
New title 24 compliant lighting and controls with branch circuiting to existing panel.
-
Jun 2021
Ground level: new enclosed tenant bike parking storage room. maher n/a.
-
Dec 2021
At&t: replace 2 antennas, add 2 antennas, relocate 2 natennas, relocate 2 rru's, install 2 rru's, install 2 antennas mounts, install new rf safety signs and striping, install 1 rectifier, install 1 bbu.
-
Jun 2023
Replace (2) 20 ton split-system dx units with (2) new 20 ton packaged rooftop cooling only ac units, miscellaneous duct work modifications.
-
Jun 2024
To comply with abe program abe#202211145257 1) provide new accessible ramp. 2) adjust door opening force to below 5 lbs. 3) revise the main entrance door maneuvering clearance ro meet max 2% slope. 4) revise the main entrance threshold to below 1/2" high beveled. 5) provide a 10" smooth kickplate.
-
Aug 2024
Revision to 202406265310 to comply with abe 202211145257. structural detail.
-
Nov 2025
At&t modifications of existing wireless facility consisting of remove & replace 2 antennas; install rf safety signs, stripipings or barricades on rooftop; remove 1 infinity power plant & 8 rectifiers; install 1 vertiv netsure power plant; 9 rectifiers and 7 converters.
-
October 30, 2026
ICE vehicles parking in San Francisco-owned garage, possible violation of sanctuary law — Mission Local
DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 4 of them are nominal $1 street-space or sidewalk permits. 2 expired or cancelled permits are not shown.