937–949 Clay Street
Financial District · San Francisco, CA 94108
Permit history
-
Jun 1982
Additions alterations or repairs.
-
Jul 2001
Seismic upgrade as per bolt plus with irregulariities corrected for this unreinforce masonry buildin.
-
Apr 2003
Provide automatic wet pipe fire sprinkler sys. for res./roof attic space to comply ordinance #170-02.
-
Jun 2004
Install/replace existing fire alarm system with intellignet system.
-
Jun 2005
Existing rrestroom to be upgraded - two new lab draw rooms, storage and reception - plus new electrical.
-
Jun 2005
Exist restroom to be upgraded 2 new lab draw rooms, storage & reception area-hvac only (m.e.p. only).
-
Nov 2012
Interior improvement of front portion of office space. installing new store, new flooring and add electrical outlet.
-
Dec 2013
Complete kitchen & bath remodel, electrical upgrade new sinks, , faucets, tub, new flooring paint entire one unit.
-
Sep 2014
Floors 2 - 4 common areas - bathrooms, kitchens, shower rooms: demolish existing drywalls at shower room. remodel demolish drywall at kitchen and bathrooms (3) shower rooms & (3) kitchens total. plumbing: replace all existing plumbing fixtures with low flow rate units. finishes: lay tiles and.
-
Sep 2014
Two units - 2nd floor: demolish (all wall inside of units) existing drywalls, no changes to the wall layouts. replace new drywalls. painting.
-
Oct 2014
Work in two units: demolish all wall inside of the units. existing drywalls, no change to the wall layout. replace new drywalls. (fire-ratewd updated). repair in-kind. painting. no changes to doors or windows. plumbing: replace existing water heater convector.
-
Mar 2015
Two units - remove unit's inside walls covering, then upgrade to the fire rated sheetrocks, patch, painting. changes to the layouts.
-
May 2015
1st floor/one unit: remodel apartment one unit- renovating kitchen, renovating bathroom, new finishes connect sprinkler heads. reconfigure layout to create 3 bedroom unit.
-
Aug 2015
Modify exisitng fire sprinkler system for remodeling in one unit on ground floor. adding fire sprinkler heads at new suspended lay-in tile ceiling for hallways & stairs on 2nd, 3rd & 4th floors. 106 sprinklers.
-
Feb 2017
Installation of new fire alarm system with control panel, smoke det. above and pull station near panel. notification appliances will be installed thru out all floor area. install monitor modules to tie in water flow & tampers to new panel. install 2 power supply & annunciator panel. ref pa.
-
Apr 2017
Common areas - electrical title 24.
-
Aug 2017
4/f: shower room remodel, common area only, (1) shower room, (2) showers only.
-
May 2019
(3) shower room/bathroom remodel. all plumbing/electrical in same location. install new shower pan, fixtures, lighting and fan. replace all in kind.
-
Jul 2021
Planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms with trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of building. there is no work being done @ ground fl of building under this permit.
-
Aug 2021
Reroofing.
-
Sep 2021
Add waste/recycling chute sys & trash rm within the building, reconfig of kitchens incl instal new exhaust sys, replace of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom one unit new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred.
-
Dec 2022
Scope of work include conversion of sro three units to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust.
-
Mar 2023
Rev to permit application 202109309577, 1 of the bedrooms in one unit @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd floor to the former study of one unit and a single occup restrm will be added. ramp will be modified @ 250.
-
Oct 2025
Remove & replace 71 interior unit doors like for like, no structural alteration, included replace frames & hardware. doors to be 20 minute rated self closing doors with smoke seals.
DBI holds 42 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 42. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update