37.7939, −122.4086 A locator map appears here once a Mapbox token is configured.
Know This Place

District 3 · Block 0224, Lot 032 · ZIP 94108

937–949 Clay Street

Hotel

  • 4 stories
  • 21,350 ft2
  • 4,592 ft2 lot area
  • 70 residential units
  • 70 rooms
  • 4 bathrooms
  • Zoned RM-4
  • Historic resource
  • Sold July 16, 2018
37.7939, −122.4086 Street View appears here once a Google Maps embed key is configured.
  1. 1909

    Built.

  2. Jun 1982
    Permit 8204485 $$$ $12,000

    Additions alterations or repairs.

  3. Jul 2001
    Permit 200107254537 $$$ $60,000

    Seismic upgrade as per bolt plus with irregulariities corrected for this unreinforce masonry buildin.

  4. Jun 2004
    Permit 200406045562 $$$ $15,000

    Install/replace existing fire alarm system with intellignet system.

  5. Jun 2005
    Permit 200506306454 $$$ $90,000

    Existing rrestroom to be upgraded - two new lab draw rooms, storage and reception - plus new electrical.

  6. Jun 2005
    Permit 200506306446 $$$ $30,000

    Exist restroom to be upgraded 2 new lab draw rooms, storage & reception area-hvac only (m.e.p. only).

  7. Dec 2013
    Permit 201312265032 $$$ $32,500

    Complete kitchen & bath remodel, electrical upgrade new sinks, , faucets, tub, new flooring paint entire one unit.

  8. Sep 2014
    Issued Permit 201409045459 $$$ $40,000

    Floors 2 - 4 common areas - bathrooms, kitchens, shower rooms: demolish existing drywalls at shower room. remodel demolish drywall at kitchen and bathrooms (3) shower rooms & (3) kitchens total. plumbing: replace all existing plumbing fixtures with low flow rate units. finishes: lay tiles and.

  9. Sep 2014
    Issued Permit 201409045457 $$$ $9,000

    Two units - 2nd floor: demolish (all wall inside of units) existing drywalls, no changes to the wall layouts. replace new drywalls. painting.

  10. Oct 2014
    Issued Permit 201410148778 $$$ $9,000

    Work in two units: demolish all wall inside of the units. existing drywalls, no change to the wall layout. replace new drywalls. (fire-ratewd updated). repair in-kind. painting. no changes to doors or windows. plumbing: replace existing water heater convector.

  11. Mar 2015
    Issued Permit 201503130779 $$$ $27,000

    Two units - remove unit's inside walls covering, then upgrade to the fire rated sheetrocks, patch, painting. changes to the layouts.

  12. May 2015
    Issued Permit 201505287370 $$$ $40,000

    1st floor/one unit: remodel apartment one unit- renovating kitchen, renovating bathroom, new finishes connect sprinkler heads. reconfigure layout to create 3 bedroom unit.

  13. Aug 2015
    Issued Permit 201508043316 $$$ $20,000

    Modify exisitng fire sprinkler system for remodeling in one unit on ground floor. adding fire sprinkler heads at new suspended lay-in tile ceiling for hallways & stairs on 2nd, 3rd & 4th floors. 106 sprinklers.

  14. Feb 2017
    Permit 201702159452 $$$ $52,000

    Installation of new fire alarm system with control panel, smoke det. above and pull station near panel. notification appliances will be installed thru out all floor area. install monitor modules to tie in water flow & tampers to new panel. install 2 power supply & annunciator panel. ref pa.

  15. Aug 2017
    Permit 201708245756 $$$ $16,000

    4/f: shower room remodel, common area only, (1) shower room, (2) showers only.

  16. May 2019
    Permit 201905160900 $$$ $60,000

    (3) shower room/bathroom remodel. all plumbing/electrical in same location. install new shower pan, fixtures, lighting and fan. replace all in kind.

  17. Jul 2021
    Permit 202107265085 $$$ $400,000

    Planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms with trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of building. there is no work being done @ ground fl of building under this permit.

  18. Aug 2021
    Permit 202108186665 $$$ $46,000

    Reroofing.

  19. Sep 2021
    Permit 202109309577 $$$ $400,000

    Add waste/recycling chute sys & trash rm within the building, reconfig of kitchens incl instal new exhaust sys, replace of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom one unit new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred.

  20. Dec 2022
    Permit 202212218894 $$$ $120,000

    Scope of work include conversion of sro three units to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust.

  21. Mar 2023
    Permit 202303103487 $$$ $40,000

    Rev to permit application 202109309577, 1 of the bedrooms in one unit @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd floor to the former study of one unit and a single occup restrm will be added. ramp will be modified @ 250.

  22. Oct 2025
    Permit 202510238050 $$$ $120,000

    Remove & replace 71 interior unit doors like for like, no structural alteration, included replace frames & hardware. doors to be 20 minute rated self closing doors with smoke seals.

DBI holds 42 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 42. 2 of them are nominal $1 street-space or sidewalk permits. 3 expired or cancelled permits are not shown.

Nearby