100 Drumm Street
Financial District · San Francisco, CA 94111
-
circa 1958 to 1962
The Redevelopment Agency photographed the property.
-
Jul 1981
X.
-
Oct 2001
Oti-2 8th fl el, me.
-
Nov 2001
Fire alarm system upgrade/ level a, b, c, lobby, street, prominade, mezzanine floors 2-44.
-
Sep 2006
Oti-1, 34th fl, el, ls, sp, me.
-
Oct 2006
Oti-2 34th floor el, me, ls, sp.
-
Dec 2007
2nd, 3rd, 4th floors - mechanical/electrical & plumbing work for three new floors of office space, . ref. #200711279018 for architectural work.
-
Apr 2008
Non structural demolition. new partitions, ceiling lights, mechanical, electrical finishes. all interior tenant work. no change in area, use, occupancy.
-
Jul 2011
New non structural partitions, ceiling, lights, outlets, millwork, finishes, fixtures. demolition under permit# 201107220871. no change in occupancy or use. mep under separate permit.
-
Aug 2012
Mechanical, electrical, plumbing for ti on the 22nd floor to relocate and add new equipment. refer to 201204309419 for ti permit.
-
Aug 2012
Mechanical, electrical, plumbing ti on the 22nd floor to relocate and add new equipment. refer to 201204309421 for ti permit.
-
Dec 2013
Full t.i. build out of existing g/f and 2/f restaurant space with in existing mall building (embarcadero #4) t.i. to include new comm'l kitchen, new indoor & outdoor bars, dining rm with private dining facilities, g/f to go area, renovation of existingoutdoor patio area with new retrackable skylight. install newlimited use/.
-
Feb 2015
21st floor: interior t. i. new non-structural parttions new doors and hardware. new finishes. mep & life safety under seperate permit. n/a for the maher.
-
Sep 2015
The scope of work is for t.i. & renovation on 18/f includes: demolition of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. construct non-structural partitions, doors, glazing, ceiling, lighting, millwork & finishes. no change of occupancy. n/a ordinance #155-13.
-
Sep 2015
T.i. & renovation on the 16/f which includes demolition & construction of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. no change in occupancy, use or area, fire alarm, sprinkler and convenience stair under seperate permit. n/a ordinance #155-13.
-
Sep 2015
17th floor: t.i. & renovation includes demolition & cosntruction of non-structural partitions, millwork, doors, ceiling, lighting, electrical & finishes, no change in occupancy or use, convenience stair, structural support for skyfold partion & sliding doors, fire alarm & sprinklers under separate permit; maher n/a.
-
Sep 2016
Non struc demolition new non structural partitions, glazing, ceiling, lights, electrical, millwork, finishes. mep sep permit.
-
Mar 2017
6th floor, full floor ti includes partition, mep's, ceiling, lighting & finishes. maher na.
-
Mar 2017
Partial floor ti includes partition, mechanical/electrical/plumbing, ceiling lighting and finishes. no plumbing or structural. maher na.
-
Aug 2018
34th fl: non-structural demolition. new non-structural partitions, ceiling, lights, finishes & millwork. no change in area, occupancy or use. mep, life safety & sprinklers under sep permit. maher na.
-
May 2023
Ste 710 - interior commercial ti of existing tenant space. includes non-structural demolition of existing ti and build out of new including non-structural partitions, doors and sidelites, suspended ceiling, casework, and finishes. mep and life safety systems are design-build under a separate permi.
-
Mar 2024
Selective demolition of non struct ceilings, lights electrical, millwork and finishes construction of non struct partitions lights, doors windows, electrical, mill work and finishes no change in occupancy, use or area.
-
Apr 2024
9th fl - new non-structural partitions millwork & finishes.
-
Nov 2025
37th floor: interior t.i. including selective demolition and construction of non structural partitions, ceilings, lights, doors, millwork and finishes. new drinking fountain to replace existing.mep deferred.
-
Dec 2025
8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demolition permit application 202512091273 by.
-
Jan 2026
8th floor. t.i. including building of new non-structural partitions. all new or separately meps, life safety work will be design-buildg and submitted separately for permit. (building is fully sprinklered) no demolition permit scope. spaced was delivered in shell condition. (demolition permit under 202512091273).
DBI holds 421 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 421. 3 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 17–21 Drumm Street Same street