614 Pine Street
Financial District · San Francisco, CA 94108
Permit history
-
Oct 1981
Additions alterations or repairs.
-
Nov 1991
Reroofing.
-
Oct 1993
Add shown case in sale service area with carpet.
-
Feb 1995
Umb (seismic retrofit general procedure.
-
Jul 1997
Revision to application 9704030.
-
Oct 1997
Revision to plans under building app #9502870.
-
Nov 1997
To erect non-electrical sign.
-
Nov 1997
2 awnings.
-
Nov 1997
Revision to pa9719589.
-
Nov 2002
Add fire sprinkler heads to exist system to comply with resiential hotel sprinkler ord #170-02.
-
Jan 2009
Aka 505a grant ave- chg of use fr retail to foot message. ti for a foot message; work incl update exist restrm. for accessibility req a new laundry rm., a v.i.p. rm., & service area. conditional use has been granted & approv by planning commission under motion #17772, 12/4/08.
-
Dec 2009
Remodel existing vacant retail space on 1st fl. remodel entry store front door, retail display area, shelving, counter storage and minor work in unisex toilet. no work in existing basement to be done.
-
Sep 2012
Tenant improvement to commercial retail space-new tenant remodel for retail & display shop. construct/install new shelving, counters. update existing accessible restroom.
-
Mar 2013
Reroofing (.
-
May 2013
Install grab bars for bathroom and shower. to comply with ordinance #029-13. 13 only install of grab bars in sro at the following locations: all common toilet and shower rooms.
-
Jun 2016
Work in one unit: all existing fire rating shall be maintained. all sheetrock to be replaced with gypsum board. new outlets and ceiling lights and 1 sink with cabinet.
-
Jun 2016
Water flood unit above restaurant, and water damaged entire sushi restaurant ceiling (dining area) and partial walls. total area 2300 sq ft of g board. hang new 5/8" type x sheetrock and paint new sheetrock when it's ready. no change to building layout and electrical receptacles.
-
Sep 2016
Unit #s: 202, 213, 301, 414 - open walls to put new electrical wires for outlets and light fixtures and patch walls in-kind. replace angle stops and install shut off valves. replace p traps for sinks.
-
Mar 2019
To comply with complaint # 201934931 one unit- two units: replace sink wiht vanity sink. replace light switches and outlets.
-
Sep 2019
Like for like fire alarm replacement. facp, smoke, manual pull. adding monitoring modules to monitor waterflow and tamper switche, existing bells will be used as originally installed. existing notification devices will be used as originally installed. ref pa 2013-0522-7666.
-
Nov 2019
3rd demolition & remodel leaking showers. new water proof pan & walking shower, new water proof walls & new subfloor.
-
Jul 2021
Comply with accessible building entrance(abe)-mandate 51-16. install power door operation and file for harship for front entry.
-
Aug 2023
Change of use from tea shop to gift shop. no resident units will be alter, remove or converted.
-
Jan 2024
To comply with nov #202315638 item 4. to remove non-permitted structure over airwell, existing owner without permit.
DBI holds 33 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 33. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update