701 Pine Street
Financial District · San Francisco, CA 94108
Permit history
-
Nov 1981
Additions alterations or repairs.
-
Mar 2008
Install vinyl siding on 2 back walls of building.
-
Jan 2018
#34 - kitchen & bath remodelling. n/a maher ordinance.
-
Feb 2018
#66 - kitchen & bath remodel, no change to walls & opening & layout.
-
Jun 2018
One unit: kitchen & bath remodel.
-
Mar 2019
One unit: kitchen and bathroom remodeling. kitchen and bathroom approx. 10' x 8' and 5' x 7' respectively.
-
Jul 2019
One unit: kitchen and bathroom remodel. approx 8'x10' kitchen and 5'x7' bathroom.
-
Jul 2019
One unit: remodle kitchen and bathroom. approx 8'x10' kitchen and 5'x7' bathroom.
-
Jul 2019
One unit: kitchen (8' x 10') and bathroom (5' x 7') remodeling.
-
Jul 2019
One unit. kitchen and bath remodeling. kitchen (8x10). bath (5x7).
-
Dec 2019
One unit - 1 kitchen and 1 bathroom remodel like for like. no structural work.
-
Jan 2020
One unit - remodel kitchen and bath in kind.
-
Nov 2020
Like for like & 2021 replacement of fa system, facp, radio communicator, monitor module, pull stations, smoke detectors, horn strobes in common areas and horns in every unit to meet 2021 mandate.
-
Nov 2020
Like for like & 2021 replacement of fa system, install of facp, radio communicator, monitor module, pull stations, smoke detectors, horn strobes in common areas and horns in every room to meet 2021 mandate.
-
May 2021
One unit: renovate kitchen & bathroom. no change to structural wall.
-
Jul 2021
One unit: one kitchen and one bath remodel. no change to layout. replace existing tub with shower in bath.
-
Dec 2021
Two units. total of 2 kitchen, 2 bath remodel. no change to layout, wall or window. update light fixtures and install new walk-in shower.
-
Mar 2022
One unit: (1) kitchen (1) bathroom remodel. no change to layout. no wall moving, no window or door moving. update light fixtures and wiring and install new walk-in shower. x1.
-
May 2022
(1) kitchen & (1) bath remodel for each unit. no change to wall or layout. remove existing bathtub & install new walk-in shower for each unit. new electrical wiring & panel inside of each unit.
-
Jun 2022
Two units: one kitchen ~ 50 sq ft and one bathroom ~ 40 sq ft remodeling for each unit. no wall moving or layout, window or door changing. remove existing bathtubs and new electrical wiring and subpanel in each unit.
-
Nov 2022
One unit & one unit. remodel of 1 kitchen and 1 bathroom in each unit. both kitchen and bath are 100sf and 50sf. no change to wall or window as kitchen and bath will keep existing layout. update light fixtures in the unit.
-
Dec 2022
One unit: (1) kitchen approx 80sqft remodeling with existing layout. (1) bathroom (40sqft) remodeling to existing layout. no change to unit layout. no wall moving update light fixtures in the unit.
-
Aug 2024
One unit: remodel (1) 90 sq ft kitchen. (1) 70 sq ft bathroom. no change to wall or windows. update light fixtures in the unit.
-
Jul 2025
One unit: (1) kitchen (1) bath remodel. no wall moving. no change to layout. update electrical. led fixtures and sub-panel in the unit. replace existing bathtub with walk-in shower.
DBI holds 51 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 51. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Submit an update