{
  "address": "1 Sansome Street, San Francisco, CA 94104",
  "path": "/san-francisco/financial-district/sansome-street/1/",
  "hook": "A 1980s tower built around the granite facade of the 1910 Anglo & London Paris National Bank.",
  "apn": "0289003",
  "block": "0289",
  "lot": "003",
  "eas_baseid": "281190",
  "coordinates": {
    "lat": 37.790485,
    "lng": -122.40094
  },
  "building": {
    "name": "One Sansome Street (Citigroup Center)",
    "architect": "William L. Pereira & Associates",
    "completed": 1984,
    "completed_conflict": "The assessor records 1983 (on file, matching the POPOS requirement year), but Wikipedia records 1984 as the tower's completion year.",
    "sources": [
      "res-wikipedia"
    ]
  },
  "parcel": {
    "year_built": 1983,
    "stories": 1,
    "lot_area_sqft": 16878,
    "building_area_sqft": 33814,
    "use": "Commercial Office",
    "property_class": "Office",
    "construction_type_code": "A",
    "zoning": "C3O",
    "supervisor_district": 3,
    "assessor_neighborhood": "Financial District North",
    "analysis_neighborhood": "Financial District/South Beach",
    "property_location_raw": "0000 0001 SANSOME             ST0000"
  },
  "assessment": {
    "roll_year": 2025,
    "assessed_land_value": 19444996,
    "assessed_improvement_value": 6242426,
    "last_sale_date": "2005-04-20"
  },
  "historic_status": {
    "ceqa_status_code": "A",
    "ceqa_status_code_article_10_11": "A",
    "ceqa_status_label": "Historic resource",
    "reason": "Historic Resource Evaluation Response, Historic Survey Result",
    "yearbuilt": "1983",
    "survey_name": "BANK OF CALIFORNIA",
    "in_article_10_11_historic_district": false,
    "source": "sf-planning"
  },
  "public_open_space": [
    {
      "name": "Citygroup Center",
      "inventory_address": "1 Sansome St",
      "type": "Atrium",
      "established": "1983",
      "hours": "Open Business Hours",
      "location": "Ground floor",
      "description": "Built with marble, and covered with glass, this greenhouse provides ample seating and tables.",
      "seating": "Ample seating at tables with movable chairs.",
      "food_service": "Yes, café/deli",
      "restrooms": "Yes",
      "subject_to_downtown_plan": false,
      "source": "sf-popos"
    }
  ],
  "public_art": [
    {
      "title": "Star Maiden",
      "artist": "Stirling Calder",
      "type": "Sculpture",
      "medium": "bronze casting",
      "location": "North side of indoor, groundfloor open air atrium plaza",
      "access": "open space and artwork are accessible business hours",
      "art_requirement_note": "Predates the 1985 Downtown Plan; the art was provided under approvals guided by the pending plan.",
      "artist_link": "https://en.wikipedia.org/wiki/Alexander_Stirling_Calder",
      "source": "sf-public-art",
      "installed": 1985,
      "artist_note": "The city's inventory credits Stirling Calder; the source cited here gives Alexander Stirling Calder.",
      "detail_source": "res-artandarchitecture-sf"
    }
  ],
  "permits": [
    {
      "number": "202606042599",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2026-06-04",
      "status_date": "2026-07-01",
      "estimated_cost": 1215216,
      "revised_cost": 1215000,
      "description": "l28: deferred mep for pa #202512172064",
      "source": "sf-building-permits"
    },
    {
      "number": "202603097165",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2026-03-09",
      "status_date": "2026-03-19",
      "estimated_cost": 2314656,
      "revised_cost": 2300000,
      "description": "24-25/f: deferred mep for pa# 202512172034.",
      "source": "sf-building-permits"
    },
    {
      "number": "202601214215",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2026-01-21",
      "status_date": "2026-02-10",
      "estimated_cost": 2347776,
      "revised_cost": 2347776,
      "description": "l30-31 deferred mep for 202511129399",
      "source": "sf-building-permits"
    },
    {
      "number": "202601214207",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2026-01-21",
      "status_date": "2026-02-10",
      "estimated_cost": 2333160,
      "revised_cost": 2333160,
      "description": "level 33,35 deferred mep for 202511129396",
      "source": "sf-building-permits"
    },
    {
      "number": "202512172034",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2025-12-17",
      "status_date": "2026-02-02",
      "estimated_cost": 4137640,
      "revised_cost": 4726476,
      "description": "24 & 25th floor; t.i. including interior renovations for office layout, restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred",
      "source": "sf-building-permits"
    },
    {
      "number": "202512172035",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2025-12-17",
      "status_date": "2026-02-02",
      "estimated_cost": 2068820,
      "revised_cost": 2443968,
      "description": "26/f: ti including renovations for office layout, restrooms, and break area. mep deferred. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred",
      "source": "sf-building-permits"
    },
    {
      "number": "202512172064",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2025-12-17",
      "status_date": "2026-02-02",
      "estimated_cost": 2068820,
      "revised_cost": 2068820,
      "description": "28/f: t.i including interior renovation for employee cafe, restrooms and horizontal exit. dph approved under deferred permit. no finish work equipment or fixture installation in food facilities or staff restroom to occur prior to dph approval uder the deferred permit. mep deferred",
      "source": "sf-building-permits"
    },
    {
      "number": "202512172045",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2025-12-17",
      "status_date": "2026-02-02",
      "estimated_cost": 1285238,
      "revised_cost": 1285238,
      "description": "level 40: tenant improvement including interior renovations for office layout, lobby, reception, meeting rooms and restrooms. mep deferred. no finish work, equipment or fixture installation in micro kitchen or food service staff restroom to occur prior to dph approved under deferred permit.",
      "source": "sf-building-permits"
    },
    {
      "number": "202512101397",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2025-12-10",
      "status_date": "2026-02-13",
      "estimated_cost": 2396444,
      "revised_cost": 2396444,
      "description": "29th/f:t.i. including interior renovations for layout, lobby, reception, 3 phone booths, multi purpose with upgrades to restrooms.no finish work equipment or fixture installation in food facilities or staff to occur prior to dph approval under defer permit.mep deferred. horizontal exit added",
      "source": "sf-building-permits"
    },
    {
      "number": "202512101393",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2025-12-10",
      "status_date": "2026-02-02",
      "estimated_cost": 2155982,
      "revised_cost": 2155982,
      "description": "38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred",
      "source": "sf-building-permits"
    },
    {
      "number": "202511129396",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2025-11-12",
      "status_date": "2026-01-07",
      "estimated_cost": 7400000,
      "revised_cost": 7400000,
      "description": "33/f & 35/f: ti office layouts, restrooms, & breakroom. dph approval under deferred permit. no finish work, fixture or equipment installation in mk or food service staff restroom to occur prior to approval under the deferred permit. mep deferred",
      "source": "sf-building-permits"
    },
    {
      "number": "202511129399",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2025-11-12",
      "status_date": "2026-01-07",
      "estimated_cost": 7200000,
      "revised_cost": 7200000,
      "description": "30/f & 31/f: ti office layouts, restrooms, & breakroom. dph approval under deferred permit. no finish work, fixture or equipment installation in mk or food service staff restroom to occur prior to approval under the deferred permit. mep deferred",
      "source": "sf-building-permits"
    },
    {
      "number": "202510207709",
      "type": "otc alterations permit",
      "status": "reinstated",
      "filed": "2025-10-20",
      "status_date": "2025-12-08",
      "estimated_cost": 2100000,
      "revised_cost": 2100000,
      "description": "27th floor: ti -non-structural partitions, ceilings, fixtures, finishes. mep deferred.",
      "source": "sf-building-permits"
    },
    {
      "number": "202404109678",
      "type": "otc alterations permit",
      "status": "complete",
      "filed": "2024-04-10",
      "status_date": "2024-11-15",
      "estimated_cost": 3100000,
      "revised_cost": 3100000,
      "description": "suite 1900: interior office remodel. new non structural walls, new electrical, new millwork, rework existing mechanical, flooring, new ceiling, breakroom.",
      "source": "sf-building-permits"
    },
    {
      "number": "202304266505",
      "type": "otc alterations permit",
      "status": "complete",
      "filed": "2023-04-26",
      "status_date": "2023-12-20",
      "estimated_cost": 750000,
      "revised_cost": 1500000,
      "description": "32/f: tenant improvement of existing office space, full demo, except bathrooms, no ceiling demo in non-build out area.mep deferred.",
      "source": "sf-building-permits"
    },
    {
      "number": "202207128237",
      "type": "otc alterations permit",
      "status": "complete",
      "filed": "2022-07-12",
      "status_date": "2023-07-14",
      "estimated_cost": 1800000,
      "revised_cost": 1800000,
      "description": "17th fl spec suite interior renovation to include demo, new walls, doors, ceilings, finishes, millwork, hvac, electrical work and plumbing. mep under separate permit",
      "source": "sf-building-permits"
    },
    {
      "number": "201612286051",
      "type": "otc alterations permit",
      "status": "issued",
      "filed": "2016-12-28",
      "status_date": "2017-03-22",
      "estimated_cost": 1000000,
      "revised_cost": 1463000,
      "description": "3rd floor: interior remodel of extg office space.",
      "source": "sf-building-permits"
    },
    {
      "number": "201512306105",
      "type": "otc alterations permit",
      "status": "complete",
      "filed": "2015-12-30",
      "status_date": "2016-12-13",
      "estimated_cost": 1850000,
      "revised_cost": 1850000,
      "description": "41st flr: new interior non-structural partitions, new & relocated mep distribution, new lighting & ceilings, new doors & hardware,new casework, new finishes; maher n/a",
      "source": "sf-building-permits"
    },
    {
      "number": "201509015751",
      "type": "otc alterations permit",
      "status": "complete",
      "filed": "2015-09-01",
      "status_date": "2016-10-28",
      "estimated_cost": 1000000,
      "revised_cost": 1704000,
      "description": "38th floor tenant improvement - new non-structural partitions, new & relocated mep distribution, new lighting ceilings, new doors, casework & finishes.",
      "source": "sf-building-permits"
    },
    {
      "number": "201406259439",
      "type": "additions alterations or repairs",
      "status": "complete",
      "filed": "2014-06-25",
      "status_date": "2015-02-19",
      "estimated_cost": 3000150,
      "revised_cost": 3000150,
      "description": "interior remodel of previously demo space on floors 9-12 & partial 28th floor for single tenant, arch. & mep. fire alarm, sprinklers under separate permit.",
      "source": "sf-building-permits"
    },
    {
      "number": "201305298040",
      "type": "otc alterations permit",
      "status": "complete",
      "filed": "2013-05-29",
      "status_date": "2013-09-20",
      "estimated_cost": 1892222,
      "revised_cost": 1892222,
      "description": "19th & 20th floor suite 1900 & 2000 - modification of (e) t.i. to include construct non-load bearing partitions, new single occupancy restrooms, new shower, new ceiling grid & tile, new gyp bd ceiling, new light fixtures, new office doors & frames millwork & new finishes. life safety permit separate",
      "source": "sf-building-permits"
    },
    {
      "number": "8500318",
      "type": "additions alterations or repairs",
      "status": "complete",
      "filed": "1985-01-10",
      "status_date": "1986-01-06",
      "estimated_cost": 2000000,
      "description": "tenant improvement of floors 32, 33, 34, 35, for offices",
      "source": "sf-building-permits"
    },
    {
      "number": "8310080",
      "type": "additions alterations or repairs",
      "status": "complete",
      "filed": "1983-10-06",
      "status_date": "1985-02-26",
      "estimated_cost": 2000000,
      "description": "tenant improvements partitions,flor coverings,wall",
      "source": "sf-building-permits"
    },
    {
      "number": "8101944S",
      "type": "new construction",
      "status": "complete",
      "filed": "1981-03-03",
      "status_date": "1986-01-21",
      "estimated_cost": 68143278,
      "source": "sf-building-permits"
    }
  ],
  "permit_summary": {
    "count_on_file": 1112,
    "range": "1981–2026",
    "shown_on_page": 24,
    "note": "DBI holds 1,112 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 1,112. 15 of them are nominal $1 street-space or sidewalk permits."
  },
  "narrative": {
    "sections": [
      {
        "heading": "The bank inside the tower",
        "body": "Albert Pissis's Anglo and London Paris National Bank of 1910 stands within the tower, its granite front carrying 38-foot Doric columns; its banking hall is the atrium the public open space occupies. The bronze Star Maiden in it is a 1985 cast of a figure Alexander Stirling Calder made for the 1915 Panama-Pacific International Exposition, commissioned with the permission of the sculptor's daughter Margaret Calder Hayes.\nSources disagree about the bank's date: Wikipedia gives 1910, SPUR's guide 1912."
      }
    ]
  },
  "sources": [
    {
      "id": "sf-eas-addresses",
      "name": "SF Enterprise Addressing System via DataSF",
      "query": "https://data.sfgov.org/resource/3mea-di5p.json?street_name=SANSOME&street_type=ST&address_number=1",
      "retrieved": "2026-08-06"
    },
    {
      "id": "sf-assessor-roll",
      "name": "SF Office of the Assessor-Recorder via DataSF (2025 secured roll)",
      "query": "https://data.sfgov.org/resource/wv5m-vpq2.json?parcel_number=0289003&$order=closed_roll_year%20DESC&$limit=1",
      "retrieved": "2026-08-06"
    },
    {
      "id": "sf-building-permits",
      "name": "SF Dept. of Building Inspection via DataSF",
      "query": "https://data.sfgov.org/resource/i98e-djp9.json?block=0289&lot=003",
      "retrieved": "2026-08-06"
    },
    {
      "id": "sf-planning",
      "name": "SF Planning Department — Historic Resource Status by Parcel via DataSF",
      "query": "https://data.sfgov.org/resource/3tsw-4idn.json?apn=0289003",
      "retrieved": "2026-08-06"
    },
    {
      "id": "sf-popos",
      "name": "SF Planning Department — Privately Owned Public Open Spaces via DataSF",
      "query": "https://data.sfgov.org/resource/65ik-7wqd.json",
      "retrieved": "2026-08-06"
    },
    {
      "id": "sf-public-art",
      "name": "SF Planning Department — Public Art (from the 1% Art Program) via DataSF",
      "query": "https://data.sfgov.org/resource/cf6e-9e4j.json",
      "retrieved": "2026-08-06"
    },
    {
      "id": "res-wikipedia",
      "name": "Wikipedia, \"One Sansome Street\"",
      "query": "https://en.wikipedia.org/wiki/One_Sansome_Street",
      "retrieved": "2026-08-06"
    },
    {
      "id": "res-artandarchitecture-sf",
      "name": "Art and Architecture-SF, \"Star Maiden, a relic of the Pan Pacific Exposition\"",
      "query": "https://artandarchitecture-sf.com/star-maiden-a-relic-of-the-pan-pacific-exposition.html",
      "retrieved": "2026-08-06"
    },
    {
      "id": "modern-postmodern-styles-context-statement",
      "name": "Hannah Lise Simonson, Page & Turnbull, for the San Francisco Planning Department, San Francisco Modern & Postmodern Architectural Styles (1960-2000) Historic Context Statement, Context: Architectural Methods & Styles, SF Survey Cultural Resources Survey, adopted August 21, 2024",
      "query": "https://citypln-m-extnl.sfgov.org/SharedLinks.aspx?accesskey=12bf7fd7aa07e2b779e0afc717eb0d789b9ba378bf6e80f7f8a1ce30cdc8946f&VaultGUID=A4A7DACD-B0DC-4322-BD29-F6F07103C6E0",
      "listing": "https://sfplanning.org/project/sf-histories-historic-context-statements#completed",
      "label": "Modern & Postmodern Architectural Styles Historic Context Statement, adopted 2024",
      "retrieved": "2026-08-31"
    },
    {
      "id": "architecture-preservation-professionals-biographies",
      "name": "San Francisco Planning Department, Architecture, Planning, & Preservation Professionals: A Collection of Biographies (volume P–R), citywide historic context statement, adopted November 17, 2021, updated December 30, 2025",
      "query": "https://citypln-m-extnl.sfgov.org/SharedLinks.aspx?accesskey=37da3dd1abd97d61cd23d20a163f6d99f76a7aaf67f04eddf11f919d978aa651&VaultGUID=A4A7DACD-B0DC-4322-BD29-F6F07103C6E0",
      "listing": "https://sfplanning.org/project/sf-histories-historic-context-statements#completed",
      "label": "Architecture, Planning & Preservation Professionals: A Collection of Biographies, adopted 2021",
      "retrieved": "2026-09-02"
    },
    {
      "id": "sf-environmental-review-222kearnystreetd1119sanf",
      "name": "San Francisco Department of City Planning, 222 Kearny Street: Draft Environmental Impact Report, Case No. 81.687E, 1983.",
      "query": "https://archive.org/details/222kearnystreetd1119sanf",
      "label": "222 Kearny Street DEIR, SF Dept. of City Planning, 1983",
      "retrieved": "2026-09-04"
    },
    {
      "id": "sf-environmental-review-onesansomebuildi1019sanf",
      "name": "San Francisco Department of City Planning, One Sansome Building: Draft Environmental Impact Report, 1981.",
      "query": "https://archive.org/details/onesansomebuildi1019sanf",
      "label": "One Sansome Building: Draft Environmental Impact Report, 1981",
      "retrieved": "2026-09-05"
    },
    {
      "id": "loc-sf-call-1909-06-17",
      "name": "The San Francisco Call, 17 June 1909, p. 7",
      "query": "https://chroniclingamerica.loc.gov/lccn/sn85066387/1909-06-17/ed-1/seq-7/",
      "retrieved": "2026-10-03"
    },
    {
      "id": "noehill-poi_one_sansome",
      "name": "NoeHill in San Francisco, \"San Francisco Point of Historical Interest: One Sansome\"",
      "query": "https://noehill.com/sf/landmarks/poi_one_sansome.asp",
      "label": "NoeHill in San Francisco",
      "retrieved": "2026-11-05"
    },
    {
      "id": "sf-board-of-permit-appeals-minutes-1984-05-30",
      "name": "San Francisco Board of Permit Appeals, minutes of the meeting of 30 May 1984",
      "label": "San Francisco Board of Permit Appeals minutes, San Francisco Public Library (Internet Archive)",
      "query": "https://archive.org/details/minutesofmeeting1984sanf/page/n112/mode/1up",
      "retrieved": "2026-11-10"
    },
    {
      "id": "sf-board-of-permit-appeals-minutes-1985-03-06",
      "name": "San Francisco Board of Permit Appeals, minutes of the meeting of 6 March 1985",
      "label": "San Francisco Board of Permit Appeals minutes, San Francisco Public Library (Internet Archive)",
      "query": "https://archive.org/details/minutesofmeeting1985sanf/page/n48/mode/1up",
      "retrieved": "2026-11-10"
    },
    {
      "id": "sf-chronicle-2026-11-11",
      "name": "San Francisco Chronicle, “Databricks opens huge new S.F. headquarters as AI fuels an office market comeback,” 11 November 2026",
      "query": "https://www.sfchronicle.com/realestate/article/databricks-san-francisco-headquarters-ai-office-22525207.php",
      "retrieved": "2026-11-16"
    },
    {
      "id": "habs-haer-ca1295",
      "name": "Historic American Buildings Survey, HABS CA-2185, Anglo & London Paris National Bank (1981), data pages. Library of Congress, Prints and Photographs Division.",
      "label": "Historic American Buildings Survey, Library of Congress",
      "query": "https://www.loc.gov/item/ca1295/",
      "retrieved": "2026-11-20",
      "cites": "data pages 2, 4"
    }
  ],
  "historic_survey": [
    {
      "survey": "Modern & Postmodern Architectural Styles Historic Context Statement (2024)",
      "source": "modern-postmodern-styles-context-statement",
      "year_built_as_surveyed": "1984",
      "architect_as_surveyed": "William Pereira & Associates",
      "note": "Citigroup Center by William Pereira & Associates, whose greenhouse atrium privately owned public open space sits inside the shell of a former bank of about 1910 by Albert Pissis - an early case of a POPOS built around a retained piece of the older city."
    }
  ],
  "historical_record": [
    {
      "date": "1909-06-17",
      "kind": "building contract",
      "description": "I. D. Bluxome and Pacific rolling mill company contracted for the concrete foundations, basement walls, sidewalk arches, floors, roof slabs, fireproofing and steel work of the Anglo and London Paris National Bank's two-storey and basement building on this corner, part of whose walls the present tower retained.",
      "source": "loc-sf-call-1909-06-17"
    },
    {
      "date": "1912",
      "kind": "construction",
      "description": "The Holbrook Building stood here from 1912 until the tower replaced it — seven storeys over a basement around a central lightwell, a steel skeleton with reinforced concrete walls and floors, composed as a three-part vertical block to the design of MacDonald and Applegarth.",
      "source": "sf-environmental-review-onesansomebuildi1019sanf"
    },
    {
      "date": "1921",
      "kind": "alteration",
      "description": "George Kelham designed an addition that nearly tripled the building and widened its Sansome Street front from one bay to five.",
      "source": "noehill-poi_one_sansome"
    },
    {
      "date": "1979-04-02",
      "kind": "designation",
      "description": "The Landmarks Preservation Advisory Board recommended city landmark status and the Planning Commission agreed on 4 January 1979, but the Board of Supervisors refused the designation on 2 April 1979.",
      "source": "sf-environmental-review-onesansomebuildi1019sanf"
    },
    {
      "date": "1979-04-02",
      "kind": "designation",
      "description": "City landmark status for the Anglo and London Paris National Bank building was recommended by the Landmarks Preservation Advisory Board and by the Planning Commission on 4 January 1979, and refused by the Board of Supervisors on 2 April 1979.",
      "source": "sf-environmental-review-onesansomebuildi1019sanf"
    },
    {
      "date": "1983",
      "kind": "alteration",
      "description": "The Citicorp project going up on this corner kept a part of the exterior walls of the Anglo-California Bank building, reused as an entrance court for the office tower.",
      "source": "sf-environmental-review-222kearnystreetd1119sanf"
    },
    {
      "date": "1984",
      "kind": "construction",
      "description": "One Sansome Street, designed by architect William Pereira.",
      "source": "architecture-preservation-professionals-biographies"
    },
    {
      "date": "1984-05-30",
      "kind": "permit appeal",
      "description": "The Board of Permit Appeals upheld the Department of Public Works and allowed the temporary permit of occupancy for the 26th floor at One Sansome Street to stand.",
      "source": "sf-board-of-permit-appeals-minutes-1984-05-30"
    },
    {
      "date": "1985-03-06",
      "kind": "permit appeal",
      "description": "The Board of Permit Appeals upheld the Department of Public Works and allowed the permit to erect a building at One Sansome Street to stand, with a stipulation.",
      "source": "sf-board-of-permit-appeals-minutes-1985-03-06"
    },
    {
      "date": "2026-11-11",
      "kind": "occupancy",
      "headline": "Databricks opens huge new S.F. headquarters as AI fuels an office market comeback",
      "outlet": "San Francisco Chronicle",
      "url": "https://www.sfchronicle.com/realestate/article/databricks-san-francisco-headquarters-ai-office-22525207.php",
      "source": "sf-chronicle-2026-11-11"
    },
    {
      "date": "1910",
      "kind": "construction",
      "description": "The Anglo and London Paris National Bank was completed here to a 1908 design by Albert Pissis: a two-story steel-frame, granite-clad temple with 36-foot Doric columns, occupying the corner 46 by 122 feet of the present building.",
      "source": "habs-haer-ca1295"
    },
    {
      "date": "1937",
      "kind": "alteration",
      "description": "William W. Wurster designed alterations to the bank, including elevators and heating.",
      "source": "habs-haer-ca1295"
    },
    {
      "date": "1932",
      "kind": "occupancy",
      "description": "The bank was renamed the Anglo California National Bank of San Francisco when the two Anglo banks consolidated; in 1956 it became a branch of the Crocker Anglo Bank.",
      "source": "habs-haer-ca1295"
    },
    {
      "date": "1915",
      "kind": "occupancy",
      "description": "The Anglo and London Paris National Bank expanded into the Holbrook Building next door.",
      "source": "habs-haer-ca1295"
    }
  ],
  "unknowns": [
    "The 2025 assessor's roll dates this parcel 1983, which is the tower that replaced the building described."
  ],
  "photo": {
    "file": "assets/photo.jpg",
    "width": 1280,
    "height": 960,
    "author": "Historic American Buildings Survey",
    "author_url": "https://www.loc.gov/pictures/item/ca1295.photos.016496p",
    "license": "Public domain",
    "cropped": true,
    "source_url": "https://commons.wikimedia.org/wiki/File:EXTERIOR,_EAST_(SANSOME_ST.)_ELEVATION,_MAIN_ENTRANCE_-_Anglo_and_London_Paris_National_Bank,_One_Sansome_Street,_San_Francisco,_San_Francisco_County,_CA_HABS_CAL,38-SANFRA,144-2.tif",
    "retrieved": "2026-10-23"
  }
}
