246–250 Sutter Street

Financial District · San Francisco, CA 94108

  • Built 1909
  • Office building
  • 6 stories
  • Zoned C3R
  • District 3
  • Historic status: historic resource
37.7900, −122.4048 Street View appears here once a Google Maps embed key is configured.
54,292 sq ftBuilding area
8,940 sq ftLot area
  1. 1940s–present

    The Metropolitan restaurant traded at this address.

    Nina Bogdan, Russian American Historic Context Statement, San Francisco Planning Department, adopted by the Historic Preservation Commission October 15, 2025
  2. Dec 1981

    Additions alterations or repairs.

    Complete Permit 8110931 $$$ $732,000
  3. Sep 1986

    New foundation additions & seismic bracing, elevators, etc.

    Complete Permit 8611459S $$$ $3,500,000
  4. May 1987

    Install new partitions, walls floor and ceiling finishes.

    Complete Permit 8707329 $$$ $450,000
  5. Oct 1987

    New interior ti, partitions, electrical, mechanical, fire sprklr.

    Complete Permit 8715275 $$$ $250,000
  6. Jul 1988

    Tenant improvement of front portion of 6th fl.

    Complete Permit 8810091 $$$ $123,900
  7. Aug 1988

    New interior tenant improvement work @ 1st floor.

    Complete Permit 8812627 $$$ $300,000
  8. Feb 1997

    Cti-1 2/f el me sp.

    Complete Permit 9702200 $$$ $220,500
  9. Jan 1999

    Oti 1 3rd floor, el & me.

    Complete Permit 9900853 $$$ $155,000
  10. Feb 2001

    One stop: tenant improvement new mezzanine, ceiling, new lithgnindg, refer to permit application 200102142099.

    Complete Permit 200102232823 $$$ $250,000
  11. Jan 2003

    Interior remodel of existing retail store, no storefront or entry work, minor m, e, p work, ceiling, partit.

    Complete Permit 200301175392 $$$ $400,000
  12. Feb 2006

    Interior tenant improvement. mechanical. under separate permit.

    Issued Permit 200602084074 $$$ $200,000
  13. Mar 2010

    Spec suits 400 & 450-4th.floor. t.i.demolition of non-structural partitions: build newnon-structural partitions.all newor revised hvac, electrical., plumb.& life safety work which will be design build; permit submitted separately. building fully sprinkeled. rest work under this permit.

    Complete Permit 201003178411 $$$ $192,675
  14. Jun 2010

    3rd floor-t.i. includes demolition of non-structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperatly. building fully sprinklered. work included common corridor. upgrade restrooms.

    Complete Permit 201006164599 $$$ $95,000
  15. Jul 2013

    5th fl: t.i includes the demolition of corridor and restroom finishes, plumbing fixutres, lighting and life safety and installing new finishes, plumbing fixtures lighting and life safety. all new or revised hvac, electrical and life safety work will be design build and submitted separately. building fully.

    Cancelled Permit 201307313194 $$$ $200,000
  16. Dec 2014

    2nd floor t.i. includes (demolition of non-structural partitions under permit application 201412022793.) building new non-structural partitions. all new or revised hvac, electrical, plumbing & ls, sprinkler will be design build & submitted separately. (building is fully sprinklered). maher n/a.

    Complete Permit 201412184012 $$$ $642,335
  17. Apr 2015

    2nd floor: mechanical & electrical work for ti - new heat pumos and transfer fans and lighting. ref pa 2014 1218 4012.

    Issued Permit 201504294871 $$$ $25,000
  18. Aug 2015

    6th floor: ti - includes demolition of non structural partitions and building back new non structural partition. all new or revised meps & life saftey & sprinkler work will be submitted under under sep permit. bld is fully sprinklered. maher na.

    Complete Permit 201508275415 $$$ $137,070
  19. Apr 2016

    Ground floor new tenant - inteiror remodeling of approximately 3418 sq ft in a multi-story, multi-tenant existing building. n/a maher ordinance.

    Complete Permit 201604195176 $$$ $190,000
  20. May 2018

    6th fl - ti to include demolition of non-structural partitions. new partitions, mep, life safety under separate permit.

    Complete Permit 201805148978 $$$ $150,000
  21. Jul 2018

    Mep for tenant improvement on the 6th fl. ref permit application 201805148978.

    Complete Permit 201807245311 $$$ $150,000
  22. Dec 2019

    Ti of existing space on basement level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing in a mixed-use building. scope includes new studios, offices, restrooms with showers and reception area. maher na.

    Withdrawn Permit 201912068950 $$$ $380,000
  23. Jul 2022

    Ti work for hot 8 yoga with non structural walls, new restrooms, locker rooms, yoga studios, laundry room with associated plumbing, mechanical and electrical.

    Complete Permit 202207088071 $$$ $350,000
  24. Dec 2025

    2/fl- commerical interior ti for soft demolition and build out of non structrual work.

    Complete Permit 202512121666 $$$ $140,000
  25. Apr 2026

    2/f: air distribution for new floor layout. mechanical only. ref 202512121666.

    Complete Permit 202604169575 $$$ $125,000

DBI holds 167 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 167. 2 of them are nominal $1 street-space or sidewalk permits.

Not yet documented: the architect and builder and the early tenants. Submit an update