Medical-Dental Building
450–464 Sutter Street
-
1864
Temple Emanu-El, the synagogue of the wealthier of San Francisco's two original Jewish congregations, was built on this half-acre site and was counted among the most beautiful buildings in the city. The 1906 earthquake brought it down, and the land stood empty through most of the 1920s.
-
1929
Its lifts were supplied by the Otis Elevator Company and assembled at the company's plant at 1 Beach Street.
-
October 15, 1929
Opened after less than eighteen months' building: a 26-storey steel-framed tower in terra cotta, built exclusively for doctors and dentists and designed by Timothy Pflueger of Miller & Pflueger, with Mayan hieroglyphic ornament on its V-shaped window bays, entrance and marble lobby, and a 450-car split-level garage behind. Lindgren & Swinerton were the general contractors; its 2,500 windows were the largest plate-glass installation in the West, and the whole cost $5 million. At capacity it held 286 doctors and 200 dentists, about a fifth of the city's.
-
1930s
An Art Deco office building designed by Timothy Pflueger; the endocrinologist Harry Benjamin, who popularised the term transsexual and argued for medical support rather than psychiatric cures, kept a medical office here during summers from the 1930s to the 1970s. Identified as potentially eligible for landmark designation.
-
1953
Sold to a Chicago investor for $6.5 million, then the largest single real estate transaction in the city's history.
-
July 17, 1969
The 450 Sutter Medical Building stood beside the site at the northeast corner of Powell and Sutter Streets.
-
October 1971
Photographed, showing the International Building.
-
Nov 1981
Additions alterations or repairs.
-
Dec 1995
Alter toilet rm floors 3, 13, 24, 25, & 26.
-
Oct 2002
New construction of priviate offices reception areas and copy coffee rooms on the 6th floor.
-
Jul 2003
Tenant improvement to 5th floor/soft demolition and new partition /add 2 new surgery light fixtures.
-
Jul 2003
Remodel ground floor space.hvac paint &carpet, install new atm, replace entry door to comply with ada.
-
Jun 2004
Oti-1 22nd/fl -el, ls, me.
-
Dec 2008
Renew permit application 2006/05/16/1766 to complete & obtain final inspection.
-
December 22, 2009
Listed on the National Register of Historic Places as a masterwork of Timothy Pflueger's Art Deco, and a medical office building that has served that use since it opened.
-
Jun 2012
Ti to create an outpatient surgery clinic. demolition of remaining mechanical and plumb. new partitions, mep, med gas distribution. nurse call sys, 2 surgery lite fixtures & 4 new handicapped access baths, waiting area, reception, offices, new 2 stop holeless hydraulic elev to comply with asme a17.1 elev code.
-
Mar 2014
#300- administrative permit for payment of additional fees based on actual cost of job under permit application 201206051830. actual cost = $1, 600, 000.00 & fees paid on $300, 000, fees due now $1, 300, 000.
-
Jun 2014
Suite #1314: new interior demising walls and nw finishes in existing tenant suite & expansion into adjacent suites on the 13th floor. electrical, plmg, lighting and lifesafty work performed on a design build basis as required and submitted as a separate permit. no exterior work. n/a for the maher/155-13.
-
Sep 2018
Ste 2414 - a tenant improvement for a dental clinic. new non-load bearing walls and ceiling. partitions for offices, lab, staff & storage rooms, a new split hvac system with distribution, new sinks for treatment areas to be plumbed and electrical systems & lighting.
-
Mar 2021
6th fl: new non-bearing partitions, gypboard & suspended ceiling, casework, fixture & finishes. new accessible restroom. new procedure room & associated service rooms. new fire rated common corridor connecting teannt space to egress stair with new finishes & light fixtures. no exterior work.
-
May 2022
26/f provide new operating room, private pre-op/recovery room, pre-op/recovery area, soiled holding room and medgas room on the 26th floor.
-
May 2026
Interior workl 24th fl, ste 2428 interior ti to a vacant dental office space. new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixtures. mep and fire protection work performed on a design build basis as required and submitted as separate permit. no exterior work.
DBI holds 429 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 429. 12 of them are nominal $1 street-space or sidewalk permits. 11 expired or cancelled permits are not shown.
Nearby
- 445–447 Sutter Street Same street
- 480 Sutter Street Same street
- 418–432 Sutter Street Same block
- 645 Bush Street Same block
- 417 Stockton Street Same block
- 625 Bush Street Same block
- 624–630 Bush Street Around the corner
- 650 Bush Street Around the corner