Jan 1983
Parapet repair.
-
Apr 1987
Additions fire sprinkler heads on top floor.
-
May 1987
Amend to #8608822 by deleting dinning area conversion.
-
Jun 1987
Fire sprinkler for each window, revision #8705253.
-
Sep 1987
Finish 3rd fl & use as additional dining area.
-
Jul 1990
Attach & tie existing brick walls to roof & floor diaphragm.
-
Dec 1990
Install steel frames to brace existing unreinforced brick walls.
-
Dec 1991
Change location of columns & frame to avoid hidden ducts/uti.
-
Jun 1993
Reroofing.
-
Jun 2013
Replace and repair broken front door. replace broken glass in store front door and windows, replace, repair 1st story floor and build new hardwood floor.
-
Oct 2013
Change of use. massage therapy center at 2nd floor. work includes adding men and womens ada bathroom, steam room, 2 massage room. remove kitchen. all work on 2nd fl.
-
Dec 2013
T-i of a new restaurant of 2, 653 sq ft. consists of a small kitchen with hood, restrooms/dining areas.
-
Jun 2015
Proposed 1st floor cafe and portion for group housing. 2nd floor & 3rd floor group housing. roof garden.
-
Dec 2017
Convert existing 2nd fl & 3rd fl from office to two dwelling units per plan. ground floor occupancy remain as retail.
-
Sep 2023
To comply with abe per ordinance 51-16, abe#202306137562, create accessible entry into retail space.
-
Nov 2024
Revision to permit application 201712085918. 1) replace floor sheating in kind if dry rot damaged. 2)replace stud in kind in dry rot damaged. 3)add detail 3/ s3.2 to reflect site condition. 4)add guard detail of roof deck.
-
Dec 2024
Remediate complaint nov 202431835. remove plaster ceiling and install 1 hr rated ceiling assembly. no structural change. commercial space only.
-
Dec 2024
Revision to permit #2017-1208-5918 to relocate (2) "c" channels along line "d" between lines 1 and 4 beneath roof, 2nd floor, and 1st floor framing to accomodate field conditions, dmj 12/18/2024.
-
Jan 2025
Revision to permit application 201712085918, 202412166930, 202411064494. pba #201712085918: remove 2 c channel on 2nd floor framing to 1st floor. reconcile permits bpa #202412166930 & 202411604494. modify stair from 3rd floor to roof to clear existing steel moment frame. change roof deck configuration.
-
Jul 2025
Reroofing hot works.
-
Jul 2025
Change of occupancy and use. interior remodel for proposed restaurant at first floor and basement levels. including exterior work for front entry at first level. accessible sidewalk entrance into existing retail space under previously approved permit # 2023-0929-7718.
-
Aug 2025
New nfpa 13 fire sprinkler system throughout ref 201712085918.
-
Jul 2026
To obtain final inspection for work approved under permit application 202412166930, 202411064494, 202501087941. all work is complete.
-
Aug 2026
Revision to permit application 202506098260. relocate steel colmun along grid line b. 4' away to original position due to obstuction of electrical panels.
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update