101 Gold Mine Drive
Glen Park · San Francisco, CA 94131
-
1963
Built.
-
1963
St. Aidan's Episcopal Church, 1963, by Skidmore, Owings & Merrill: an irregular stucco-clad hexagon built as one of the community buildings of the Diamond Heights redevelopment.
-
Jul 2001
Add new 385 s.f narthex space, add new 270s.f covered staircase with wheelchair lift, add new ext h.c.
-
Mar 2002
Revision to permit application 200107093213.
-
May 2002
Rev#200203282583.add curb cut/landing/approved by sq ft dpw4/29/02.
-
Jun 2002
Fire sprinkler work only. relocate 3 fire sprk & add 4 fire sprk tothe existing system. all on grd f.
-
Aug 2013
Reroofing.
-
Sep 2014
Remove existing stucco. replace windows with milgard vinyl windows to match. repair any decayed framing in kind. install self adhered, vapor permeable weather barrier. install rain secreen and new 3 coat stucco to match. paint to match.
-
Jul 2017
Remove/replace commercial hood; replace window with door & panic push bar.
-
Aug 2017
T.i. to lower floor of an existing religious/institution to become a licensed child care center with 14 max children. child care is added as educational use (a-3 change to e). no change to upper floor. no change to existing electrical, lighting, hvac, plumbing, fire sprinkler. kitchen will not be accessible during.
-
Sep 2017
Lower floor- install new panel with radio comm., heat detector above & pull station near panel, install notification appliances throughout for complete coverage. tie-in existing flow & tamper to new panel. t.i. permit application 201708225605.
-
Jun 2018
Increase number of children from 14 to 24 at existing daycare. planning only allowed 15 children max before. no change to use, size, exteriors. net increase of children is > 30. school drop-off & pick-up management plan is not required. add 2 class 1 bicycle spaces, add 2 baby changing stations.
-
Jul 2025
Enlarge existing kitchen on 2nd fl. new commercial cooking equipment, new mechanical rooftop units, replace existing water heater, new electrical sub panel.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.