1040 Ashbury Street
Haight Ashbury · San Francisco, CA 94117
-
1962
An apartment building with its courtyard raised above street-level parking and enclosed by the building on most sides — an amenity bought at the cost of rentable space.
-
Oct 1985
Comply with rap reports.
-
Oct 2002
Reroofing.
-
Mar 2006
Repair spalling concrete at front entry stairs as per nov#200506597.
-
Nov 2006
Work @ one unit. remove / replace kitchen cabinets, sink, stove, countertop, appliances. remove / replace tub, sink, toilet (1 bathroom) non structural work. new lighting (fluor). comply with his nov# 200560597 & his nov# 200562722.
-
Dec 2006
Replace/modifying deck with smaller conforming stairs and deck to comply with nov #200562722 and comply with nov 200788260.
-
Aug 2008
Work @ one unit only. remove & replace kitchen cabinets, paint. install hardwood flooring throuout unit. no structural work.
-
Jul 2009
#4: replace kitchen cabinets.
-
Jan 2010
To obtain final inspection for work approved under permit application 200808290500, all work is complete.
-
Sep 2011
Renew 200907283628 for final.
-
Sep 2011
One unit: to obtain final inspection for work approval under app#200611077018.
-
Sep 2011
Renew for final 200808290500.
-
Dec 2011
Reroofing.
-
Aug 2012
Comply with nov 200923267. legalize windows installed without permit. windows installed under inkind visible from the street.
-
May 2013
To comply with nov #201282734. repair existing pre-fabricated main stairs in-kind. upgrade stair railing & guardrails.
-
Jun 2014
One unit only: to obtain final inspection under permit application 200808290500.
-
May 2015
To obtain final inspection for #2. finalize 200611077018 #2.
-
Jun 2015
To obtain final inspection one unit per expired applic. #200907283628.
-
Mar 2016
Install a new metal gate at entry. gate will be metal and mostly transparent to match existing railings on property. gate will be 3 ft by 80 inches. reviewed by justin greving.
-
Sep 2017
Soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.
-
May 2018
Repair dry rot and stucco repairs at front wall of building, repair in kind about 75 sq ft max.
-
Feb 2020
Mondatory soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. addition of moment frame at open front and addition of plywood. sill bolts and holdowns of e walls.
-
Aug 2026
Exterior stair repair, front of building, less than 50% repairs, street facing.
-
Aug 2026
One unit: remodel 2 bathrooms and 1 kitchen in kind like for like. no tub conversions. no removal of walls.