37.7703, −122.4391 A locator map appears here once a Mapbox token is configured.
Know This Place

District 5 · Block 1241, Lot 009 · ZIP 94117

75 Buena Vista Avenue

35-unit apartment building

  • 7 stories
  • 25,252 ft2
  • 4,394 ft2 lot area
  • 87 rooms
  • 35 bathrooms
  • Zoned RH-3
  • Sold March 9, 2010
37.7703, −122.4391 Street View appears here once a Google Maps embed key is configured.
  1. 1931

    Designed by Albert H. Larsen, built as infill on what was left of a lot once occupied by the stables and garage buildings of the former Buena Vista Sanitarium. Apartment buildings above neighbourhood scale are rare in the Haight Ashbury, and this is one of them.

    Large Apartment Buildings Historic Context Statement, adopted 2024
  2. Feb 1982

    Otc alterations permit.

  3. Nov 1990
    Permit 9023093 $$$ $55,000

    Update existing penthouse, replace windows & door.

  4. Jan 1991
    Permit 9100307 $$$ $100

    Revise detail for approved ap #9023093.

  5. Oct 2005
    Permit 200510075138 $$$ $24,701

    Reroofing.

  6. Aug 2009
    Permit 200908315869 $$$ $35,000

    Remove and replace cabinets in kitchen with similar new cabinets and countertop. remove and replace bathroom tile and fixtures and replace in kind. no structural work. all work in apartment on top floor #903 only. no walls to be moved during remodel. no structural work.

  7. Apr 2014
    Permit 201404102957 $$$ $6,000

    200 sq ft deck serving existing 9th fl penthouse apt. deck replaces original deck built with the penthouse apartments and removed without a permit. maher--compliance with ordinance no. 155-13 not required.

  8. Nov 2019
    Permit 201911086889 $$$ $52,300

    Replacement plus 2021 mandate upgrade of fire alarm system in fully sprinklered building. replace of existing facu with new ifp-75 and 16 pull stations. new aes-7707, 2 power supply, 10 smoke detectors, 54 low frequency sounders and 6 modules/relays.

  9. Dec 2025
    Permit 202512151835 $$$ $5,000

    Stabilize concrete facade per nov#202546508 with supervision of the engineer.

2 nominal $1 street-space or sidewalk permits are omitted from the timeline.

Nearby