321–327 Divisadero Street
Store building
-
1896
Built as Divisadero Hall, a meeting place for the Olympus Parlor of the Native Sons of the Golden West and, over the years, for many other fraternal and social groups. One of the few purpose-built fraternal lodges and social halls in the city to predate the 1906 earthquake and survive it.
-
1900
Built.
-
1953
A Chekhov festival was staged here in 1953, jointly sponsored by the Russian American Society and the American Russian Institute.
-
January 1966
The San Francisco Tape Music Center held a late-night Worship Service here as one of the Trips Festival's after-hours side trips in January 1966.
-
Sep 1988
Reroofing.
-
Jan 2003
New french door and balcony addition at rear of building, facing parking 3rd floor.
-
Jul 2014
Replace approx 1000 sq ft siding. 2 windows. 1 door in kind at rear. ufactor.32 max. door is commerical only under this permit.
-
Oct 2014
Upgrade electrical panel for entire building. 2nd fl fire damage repair and smoke ebatement. 3rd fl cover e glazing with gypsum board. add elecrical panel. new ada shower under separate permit.
-
Feb 2015
Change of use from retail to exercise studio/gym. install hvac unit. build new ada bathroom & shower per plans.
-
Mar 2015
Erect (1) an electric double faced projecting blade sign for dancing studio/gym.
-
May 2015
Build non-load bearing partition wall inside add outlets add 3 ceiling lights. work at first floor exercise studio.
-
Jun 2015
Change of use. determining appropriateness for formula retail for arthur murray dance studio on 2nd floor.
-
Jul 2015
Revision to 201506297581 to add lighting plan.
-
Mar 2016
Removal of failing lath & plaster in 3rd floor bathroom and se office space. install new sheetrock to comply with 1-hr fire rating requirements at exterior walls and ceiling. no structural work to comply with complaint 201600761.
-
Jan 2020
To complete/renew work started on 3rd fl office interior refer to permit application 201603162256. complete work in bathroom.
-
Apr 2021
Exploratry demolition for removal of sheetrock. approx 400sq ft in different areas. patch & repair in kind after exploratory demolition.
-
Apr 2021
Change of use from yoga studio to private members pottery classes. (no change in occupancy).
-
Feb 2023
New meditation center renovation in existing tenant space on 1st and 2nd floor including accessibility upgrading of primary entrance and toilet on the 1st floor and constructing two exterior rear stairs.
4 nominal $1 street-space or sidewalk permits are omitted from the timeline. 1 cancelled permit is not shown.
Nearby
- 305–319 Divisadero Street Same street
- 324–328 Divisadero Street Same street
- 301 Divisadero Street Same block
- 1111 Oak Street Same block
- 351–353 Divisadero Street Same block
- 1153 Oak Street Same block
- 1061–1065 Oak Street Around the corner
- 1138–1140 Oak Street Around the corner