600–604 Divisadero Street
Haight Ashbury · San Francisco, CA 94117
-
1921
This Bank of Italy branch at the Hayes Street corner was one of several with a Russian-language department, opened in 1921 to serve the city's Russian community; the bank published its customer booklet in Russian.
-
Oct 1982
Additions alterations or repairs.
-
Dec 1986
One canvas awning with steel galvanized welded tubing frame.
-
Aug 1995
Reroofing.
-
Apr 2002
Remove ex kitchen cabinets/cntr install new cabinets/laminate counter no structural walls touched.
-
Jul 2002
Remove existing cabinets and cntrtop, install new, new tile in bathtub only.
-
Feb 2003
Remove cabinets in kitchen. install new kitchen cabinets +formica top. replace tile on bathtub wall.
-
Sep 2006
Replace kchn cabinets, bathroom vanity, bathroom medicine cabinet, flourescent light 50% in kchn, bath light flourescent or controlled by motion sensor in one unit only 1 bath and 1 kchn only.
-
Apr 2007
Install food service equipment for food sales.
-
May 2009
Remove junior 6x12 poster panel general advertising sign to comply with nov# 9381.
-
Jan 2011
G/f- remove interior finishes. install drywall to 1 hr fire rating on walls and ceiling, restore to shell condition for future tenant ( currently vacant, was a meat market). no structural work.
-
Jul 2011
Voluntary seismic upgrade with front steel moment frame, shearwalls, anchor bolts and brick wall supports for this commercial area only.
-
Dec 2011
Remove existing walls and fixtures of restroom. install new drywall for restroom. new and relocated restroom fixtures. new flooring, enlarge opening to rentable space. no structural work. currently vacant. remain vacant. upgrade existing restroom for accessble reqmt.
-
Dec 2014
Commercial t.i. selective demolition and new construction of ada restroom upgrade: doors, frames, minor electrical and plumbing.
-
Jan 2015
Revision to 201412053165. minor dry rot repair under exsting storefront sill.
-
Jan 2015
Electrical layout (plans) t-24, ref. to application 201412053165.
-
Sep 2016
#9- kitchen and bath remodeling.
-
Aug 2017
#4 & #8 - replace 2 kitchen counter tops, remodel 2 bathrooms.
-
Sep 2017
Work in one unit: remodeling bathroom. replace kitchen countertops and all appliances only - not full kitchen remodel.
-
Mar 2019
Accessible business entrance program per ordiance 51-16: replace existing wood door with ada compliant door in same opening no structural chamge outside. door will not swing over the public row.
-
Jul 2022
One unit. remodel 1 54 sq ft kitchen and 1 30 sq ft bath. no wall moving, replace 1 bathtub to walk-in shower. new electrical wiring and panel inside of the unit. no layout change.
-
Oct 2022
Upgrade existing fire alarm system to comply with sffc section 1103.1.6.1.
-
Sep 2023
As built to permit 202210315505. removed 1 smoke detector, riser diagram and equipment list.
5 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Submit an update