834–838 Divisadero Street
Store building
-
1916
Built.
-
Sep 1987
Remove concrete ramp, block with window & garage door.
-
Sep 1993
Parapet.
-
May 1994
Renewal of permit inspection permit application 9315152.
-
Sep 2013
New ada restroom. 6-car stacker inserted at rear of building. all work interior to building.
-
Jun 2015
Change of use from existing auto body repair shop to retail suites. no change to the building height. floor area to be decreased due to new street level patios and interior bike parking. n/a for maher ordinance.
-
Jul 2015
Restaurant t.i. for 3923 sq.f.t restaurant including kitchen, currently auto body although this permit to change of use from retail (permit application 2015/06/24/9842) to restaurant. ** maher: compliance with ordinance no# 155-13 not required **.
-
Aug 2016
Change of use from auto shop to cafe. site permit application for new non-structural tenant improvement for tea cafe on ground level. ** maher: n/a **.
-
Dec 2016
Restaurant tenant improvement including kitchen & kitchen hood. change of occupancy from mercantile (m) to restaurant (a-2). ** maher: n/a **.
-
Jan 2017
Installation of new fire alarm system including control panel, aes radio, smoke & pull station, notification appliances throughout, monitor modules to monitor flow, tamper switch & ansul system, relay modules for elev recall. permit application 201507070795 & #201506249842.
-
May 2017
Install new fire sprinkler system per nfpa 13 throughout building included 4" fire service per nfpa 24. total 97 heads app 2015-0624-9842 "s"-3.
-
Jul 2017
Revision to permit application 201507070795, specify different pollution control unit for solid fuel kitchen exhaust. ul300 and f/s connection sep permits. n/a ordinance #155-13.
-
Oct 2017
As built 201701137133, install ne horn strobe and relocate 2 exist horn strobes, 1 anusl system due to remodel on 1st fl to reflect job site. ref 201612165218 maher not req.
-
Jan 2018
As builts to 201701137133 phase 1 - install monitor modules for flow, tamper & pollution control system (installed by others). install relay modules for elev recall. remove ansul system. install notification devices on 2nd floor only. maher n/a.
-
Feb 2018
Install ul 300 core total flood and core dcu fire system to protect kitchen hoods, cooking equip, pollution control unit. sprinkler connection to core system and calculation verified. ref.
-
Feb 2018
Install fire sprinkler line for the hood code system, extend 13 heads from existing sprinkler system, to new ceiling in the kitchen, ap 201705096057.
-
Feb 2018
Add 836 & 838 divisadero st to 834 divisadero st, 1180/015. all 3 are commercial suites. ref: 201506249842 & 201608266130.
-
Mar 2018
Install ul300 ansul fire systems to protect kitchen hoods and cooking equipment. ref pa 2015-0707-0795, m894307; n/a maher.
-
Jun 2018
Install illuminated double-faced projecting wall sign.
-
Jul 2026
Fire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area within the first and 2nd fl restaurants below. no new restaurant equipment, mechanical equipment that is damaged to be replaced only. no new plumbing fixtures.
-
October 3, 2026
NoPa's Che Fico Sets October 18 Reopening After Devastating Divisadero Fire — Hoodline
9 nominal $1 street-space or sidewalk permits are omitted from the timeline. 1 cancelled permit is not shown.
Nearby
- 746–750 Divisadero Street Same street
- 846–848 Divisadero Street Same street
- 856–860 Divisadero Street Same block
- 1266–1270 Fulton Street Same block
- 1200 Fulton Street Same block
- 841–863 Scott Street Same block
- 1306 Fulton Street Around the corner
- 1354–1358 Fulton Street Around the corner