1563 Page Street
Haight Ashbury · San Francisco, CA 94117
-
1977
Gumption Theater, where the San Francisco Gay Men's Theatre Collective staged Crimes Against Nature in 1977 - a production that ran for nearly two years and toured to Santa Cruz, Toronto and New York.
-
Dec 1985
Join dwelling to school and add at rear to former dwelling.
-
May 1993
Remove existingroof reduce size of 1 skylite provide 6 new one.
-
Oct 1993
Horizontal addition.
-
May 1994
New fire sprinkler system.
-
Jun 1994
Modif. to app #9317464 change floor framing of bay window.
-
Mar 1997
Remodel existing classrooms on the 2nd fl and new cab on 1st.
-
May 1997
Sprinklers.
-
Sep 1998
Repair deck at rear of dry rot damaged.
-
Sep 2001
Elevator recall upgrade of fire alarm.
-
Dec 2003
Horizontal addition- addition of 19, 300 sq ft three stories school to the existing school east side.
-
Mar 2004
New fire sprinkler system for new constructin includes risers, fdc, n backflow preventer. no undergro.
-
Apr 2004
Excavation, shoring and underpinning of building.
-
Sep 2004
Provide fire alarm system for school, new fire alarm panel horns, strobes, pull stations.
-
Apr 2005
Add solar (pv)modules to existing structure.pg&e grid tie, raised racks on flat roof(10.34kw)22 tilt/15 ti.
-
Jun 2005
Modify existing fire sprinkler system on ground, 1st, 2nd, 3rd/fl.
-
Nov 2005
Revision to 200312232917-s2 revise sheet ac.02 to correctr breached in rated wall/work complete work complete in coodination w fire inspector revise sheet m-20 to add fire damper on fusible link owrk cmplete in coordination with on fusible link work complete in coordinationw/fire field inspection.
-
Feb 2016
Ti work to private offices & makers classroom on 1st floor. ti work to faculty louge on 3rd. entry way upgrade for accessibility. no structural work. mep & fire life safety under separate permit.
-
Aug 2016
Provide new lighting & branch to existing panel, reference permit 201602058951.
-
Mar 2018
Place a new equipment screen on existing structure.
-
Jan 2019
Replacement of all e roof equipment & shall use all e inerior ducts where feasible. at time of hvac replacement, roofing finish replacement will also occur on buildings b, c, & d as well as skylight waterproofing maintenance & repair. building b roof will require structural strengthening to accomodate.
-
Aug 2023
1/f: voluntary replacement of the fire alarm panel motherboard. card replacement in the graphic anmunciator and a new cellular dialer. there is no record plan or u.l certificate for the existing system.
-
Mar 2025
Tenant improvement of multipurpose performance space on the ground floor of the gumption building on the campus of urban school of s.f project scope, affecting 1595 sq ft of existing space, includes: installation of a manually operated folding acoustic partition reinforcement of existing heavy timber.
-
Apr 2025
Ti of g/f "gumption building" on urban school of sq ft to convert music rehearsal classroom into typical academic instruction affecting 1079 sq ft: new storage & work surface casework, icluding new accessible sink, new teaching wall infrastructure & new finishes.existing mechaical system to remain.
-
Apr 2025
Ti of 2/f "middle/library building" of the urban school of sq ft. project includes finishes upgrades for 698 sq ft of existing space.
DBI holds 34 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 34. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the year the building went up, the architect and builder, the early tenants and the date of the last recorded sale. Submit an update