1111 Junipero Serra Boulevard
Church · Ingleside Terraces
-
1953
Built.
-
Jul 1988
The construction of a seven ft high concrete retaining wall.
-
December 19, 1996
The City Planning Commission approved, 5-0, three wireless antennas on the 122-foot steeple of Temple Methodist Church (Motion 14272, as printed).
-
Jan 1997
4 antennas mounted on lower portion of church.
-
Aug 2002
Reroofing.
-
February 3, 2005
An existing church, the Temple Methodist Church, stood at the property.
-
October 27, 2005
The City Planning Commission approved the conditional use authorization to install six cellular panel antennas and associated equipment at the United Methodist Church at 1111 Junipero Serra Boulevard, as part of a wireless transmission network operated by Cingular Wireless.
-
October 27, 2005
The United Methodist Church stood at the property.
-
Nov 2005
Installation of n cingular wireless communications network including antennas on e steeple and equipment at grade. new installation.
-
May 2006
Install 2 facade mounted microcell antennas with the associated equipment cabinet located on the ground with 5'11" high redwood fence.
-
Nov 2006
Install 3 antennas within a steeple behind faux panels(painted to match). 4 bts equipment cabinets will be located in outdoor area in fenced compound.
-
Mar 2010
A modification to an existingunmanuel telecommunications facility consists remove/replace (3)existing antennas with (3)new antennas with new ret's (remote electrical tilt).ret powered by iow voltage signal thru existingcoax cable.add anew 3106 rbs cabinet, (3)newdtma's &(6)new runs of coax.remove/replace existingexistingfrp enclosures.
-
Mar 2013
Sprint proposes to notify an unmanned telecommunications facility. (3) existing panel antenna to be hot swapped. 3 new panel antennas to be mounted on existing steeple. (3) existing equipment cabinets to be removed. (2) new equipment cabinets to be installed @ existing outdoor equipment area. new shrouds over antennas.
-
Nov 2013
Modification to an existing at&t facility including renoving & replacing 3 existing antennas, installing 3 new rrvs, 3 new surge suppressors inside lower part of steeple. n/a for maher ordinance.
-
May 2014
Sprint proposes to modify its existing site by replacing 3 antennas with (3) triband antennas (1) per sector, (3) new rrh, (1) per sector, new coax jumper lines, reuse hybrid cables or install new as needed, new string of battering in existing cabinet, new 2.5 equipment in existing mmbs cabinet.
-
Aug 2015
Modification to an existing at&t mobility wts facility included: r&r 3 existing antennas with 3 new antennas on chruch steeple. r&r 3 existing rrus & mofing new rrus to steeple, r&r 1 existing equip cabinet with 1 new equipment cabinet, install 2 new surge suppressors & 1new hoffman box. n/a maher ordinance.
-
Mar 2017
At&t modification install 3 new antennas, 6 new rrys, frp screens, purce; ; cabinets, other sm equip; relocate e antenna, 2 e rrus-11, remove 3existing frp screen, 2existing dus-41 maher na.
-
Dec 2018
Att modification: r+r 6 existing antennas with 6 new antennas; remove 3 existing antennas; install 6 new rrus; remove 3 existing rrus; remove 3 existing strings of batteries, install other small equip.
-
Oct 2021
Modification of an existing t mobile telecommunication facility consisting of the following: install 1 new 25kwh diesel generator, 1 new automatic transfer switch mounted on existing cmu wall, insall 1 new 6 fire extenguisher on mounted existing cmu wall and 1 new generator e-stop mounted on existing cmu wall.
-
Dec 2021
At&t: remove (3)existingantennas, intall(6)new antennas, remove(6)existing rrus; install(3)newrrus; remove & replace(1)existingbattery cabinet; install(8)newbatteries; no new electrical work.
-
Jun 2022
At&t: install 1 standby diesel generator with case fuel tank on concrete pad & 200a ats/ camlock. interate new generator. install pull string in each conduit. 1 new 2" & 1" electrical conduit with conductors. 2 new 1" electrical confuits with conductors to ac panel. 1 new 1" alarm conduit & cabling.
-
Jun 2022
Install 3 antennas (1/sect), 6 rru's (2/sect) & equip cabinets on roof.1 sect at 1 location on roof, antennas concealed with in frp screening.power lines & fiber lines will be placed in new hybrid cable on roof and run from equipment cabinet to ea antenna.all proposed screening/concealment/paint match.
-
Aug 2023
Revision to permit application 202206025416, install 1 article 202 optional standby deisel generator with ul-142 base fuel tank anchored to existing concrete foudnation.install cmv compound expansion area and 200a ats/camlock near existing at&t equipment area. intergrate new generator with existing service.
-
Aug 2024
T-mobile remove (3) existing antennas all rrvs existing cabinet. istall 6new antennas 6new rrvbs, 2new cabinets, 12 new batteries, new 125a and 15a breaker.
DBI holds 42 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 42. 1 of them are nominal $1 street-space or sidewalk permits. 6 expired or cancelled permits are not shown.