Aug 2006
Kchn remodel: upgrade electrical in kchn new lights to be low voltage per t 24.
-
Mar 2017
Compliance with mandatory seismic retrofit program 2012 iebc appx a-4. & 2016 sfbc sec 34b. n/a for maher ordinance no.155-13.
-
Jun 2018
One unit: repair of water damaged kitchen. no change of existing floor plan. n/a for maher.
-
Apr 2022
Remodel bathroom- no walls built or moved. all fixtures same location. install custom shower pan, new valve and fixtures. update panel insulate, sheetrock and tile.
-
Oct 2022
Spcb report #220916bg08 (common area), dated 09/14/22: item #4- repair one window bay siding area. item #7 - repair dry rot found at the base of right wall.
-
Feb 2023
#1: kitchen & bath remodel, demolition kitchen & bathroom to studs ano structural install new kitchen cabinets and bathroom tile.
-
Dec 2023
Reroofing.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.