1348 10th Avenue
Inner Sunset · San Francisco, CA 94122
-
1899
Built 1899. Architect: Charles R. Wilson. Contractor: C. F. Sheibley. San Francisco Landmark No. 29 (designated 1970). SFFD Engine Co. No. 22 firehouse; company moved to 1290 Sixteenth Avenue in 1962; one of ~7 surviving 19th-c. SF firehouses; one of three Inner Sunset City Landmarks along with the Sunset Branch Library (1305 Eighteenth Avenue) and 320 Judah Street.
-
Jul 1986
Basement renovations, demolition & removal, carpentry drywall.
-
Oct 1986
Provide (2) 1 1/2 hour fire-rated doors @ communicating.
-
Jul 1989
New service to have city approved backflow device sprinkler.
-
Sep 2008
Exploritory demolition. no structural work. 2 foot square min opening to expose existing structure and utilities. comply with ab-017 sfbc.
-
Sep 2008
Voluntary structural upgrades, accessiblilty upgrades, accessibility upgrades, 4 accessible bathrooms, 1 unisex bath, partition changes. mep separate permit.
-
Nov 2008
Revision to permit application 2008-0923-2425 due to existing field conditions.
-
Nov 2008
Change of use from school to office. voluntary structural upgrade, accessibility upgrades & accessible bathrooms. 1 unisex bathroom & partition changes per permit application 2008/09/23/2425 & permit application 2008/11/20/7065.
-
Jan 2009
Repair dry rot at front and rear facades where building meets grade.replace with matching material in kind. approximately 100 sq ft.
-
Mar 2009
Building volume restoration(infill) at 1st floor and mezz levels @ rear & front entry. infill @ existing recessed entry, infill @ rear 1st fl. structural. upgrade, access upgrade, 4 ac baths, 1 unisex and ptn. change under #2008.0923.2425 & #2008.1120.7065. change of use from school to office under #2008.1125.7283.
-
Mar 2009
Bring air changes into building. with centrifical ventilator, vent both fans. ref. appl.# 2008/0923/2425 & 200811207065. (5) bathroom exhaust fans.
-
Mar 2009
Tenant improvement work for fire sprinkler system. relocate 6 & add 26 fire sprinkler heads.
-
Apr 2009
Install fire alarm monitoring system, work done in basement & 1st floor. no work done on mezzanine or top floor.
-
May 2015
Reroofing.
-
Jul 2023
Revision to 200904277060: converting an e duct to cellular communicator.
7 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update