1320–1330 14th Avenue
Inner Sunset · San Francisco, CA 94122
-
1923
Built 1923. Architect: Frank and Will D. Shea (Shea and Shea). St. Anne's Convent, for the Sisters of the Presentation.
-
1951
The Office of the Assessor-Recorder photographed the property for tax assessment. St. Anne's Convent was at the address.
-
Feb 1993
Install new door, partition wall to separate exist storage.
-
Dec 1994
Remodel exist bathrm at rear grnd lvl. replace in kind.
-
Aug 1995
Instll non-bearing partition walls at existingstorage area(basmnt.
-
May 2003
Remove existing wood windows & install with aluminum windows.
-
Feb 2013
Fire alarm system replacement one for one in a private school. there is no record plan or ul certificate for the existing fire alarm system.
-
Feb 2016
Bsmnt: new double check detector assembly (dcda) bsmt to replace old check valve.
-
Dec 2016
Demolition of existing bathrooms and new tenant improvements, including accessibility upgrades on 2nd and 3rd floor of existing st. annes' convent.
-
Dec 2016
This permit is to start demolition of rooms as per application #2016-1205-4145. the t.i work is under permit application 2016-1205-4145.
-
Mar 2017
Seismic retrofit of existing school. path o f travel upgrades.
-
May 2017
Revision to 2016-1205-4145 install steel beam.
-
May 2017
Remove existing open central stair connection to first floor install new stair to provide new imdependent replacement of egress.
-
Jul 2017
Installation of a new manual and automatic fire alarm system ref 2016-1205-4145.
-
Jul 2017
Installation of ada ramp and accessible path of travel for access to temp. portable classroom and restroom by others, under seperate permit. temporary classroom not to exceed 2/2/2018.
-
Jul 2017
Temporaty classroom not to exceed 02/18/2018, structural foundation of school yard to accomodate movable temporary modular trailer/restroom, in reference to permit application 201707121658.
-
Jul 2017
Structural foundation of school yard to accomodate movable temporary trailer/classroom. in reference to permit # 201707121650 temporary classroom not to exceed feb.18. 2018.
-
Nov 2017
Basement, 1st fl, 2nd fl, remove e fa devices durning ti, reinstall them post construction. add 1 cellular communicator and 1 smoke detector at facp, pre test and sffd test.
-
Feb 2018
Evac maps for floors 2nd an 3rd.
-
Feb 2021
Interior partition barrier removal, new accessible restroom and new ada compliant ramp at entryway.
5 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update