2350 Geary Boulevard
Japantown · San Francisco, CA 94115
-
1927
Built.
-
1955
The four-storey building on the north side of Geary Boulevard between Baker and Broderick Streets was built.
-
Aug 1983
Electrical & exhaust renovation-832404.
-
May 1984
Remodeled is on thhe 2nd & 3rd fl.
-
Aug 1985
Rearrangement of limited area of offices on 2nd floor.
-
Sep 1987
Remodel 1st fl, new partitions, casework, shower, plumb/electrical.
-
Dec 1987
Remodel existing conference room into a small pharmacy.
-
Jun 1991
Dca 131-275 renovate teen age clinic-mob.
-
Jan 1993
Renovat.of 3rms into nurse station & staff lounge/kaiser sq ft.
-
May 1998
Structural (seismic)upgrade & ada upgrades.
-
Aug 1998
Remodel portion of 2nd floor for pediatric specialties.
-
Aug 1998
Remodel existing info. tech data control room in basement.
-
Mar 2003
Ada compliance, remediation work.
-
Sep 2003
Add fire alarm devices for ada remediation - work included under previous approved permit application 200303119329.
-
Jun 2005
New electrical outlets, mechanical cooling equipment @ existing telecommunication areas, mep permit only.
-
Feb 2007
Remodel existing office area to a new echo suite area, no structural work. replacement of ceiling & lighting.
-
Aug 2007
Revision to approved appl. 2007 0212 3942: modify structural floor framing. install new glulam beams at ground floor, new posts at ground and basement floor, and new concrete footings, all where and as shown on the plans.
-
Apr 2008
2nd floor-remodel various department areas (office), including reception and some adjacent areas which involves non-load bearing walls and rebuild partition wall for new offices/flooring.
-
May 2008
Water intrusion remodeling-west exit corridor roof canopy, concrete site work on exit corridor, pavement to exterior wall joint sealant, pavement joint sealant, masonry wainscoting sealant.
-
Dec 2008
Replace 133 existing windows - single panel aluminum. 133 new double panel - low efficiency windows-aluminum.
-
Jan 2009
Remodel of existing waiting area, reception, work area & office. construction of new accessible transaction counter.
-
Feb 2010
Kaiser. remodel various cardiology dept. areas including the reception and waiting areas and adjacent offices and work on first floor.
-
May 2011
Upgrade existing electrical and mechanical cooling system for main building telecommunication room, in building basement. installation new telecomm equip in both btr and auxillary telecommunication rooms on upper fl.
-
Jun 2012
Building maintenance includes: coating of existing building ext, patch & repair of selectively demolished portions of ext. building shell, patch & repair existing exterior surfaces, replace existing exterior lighting, remvoal of existing fire escapes & mechancial unit, replace existing wood flooring & repair concrete floor slab rm #122.
-
Jun 2012
1st floor ti for new telephone roomincludes selective demolition, new partitions, installation of new electric receptacles, new it equipment storage racks, 1 new 1 ton fan coil unit & 1 new smoke detector. fire alarm deferred - under separate permit.
-
Jun 2024
Fire alarm system migration @ the kaiser(cn31-03)medical office building; migrant to new equipment, 1 control panel, 11 pull stations, 7 modules, 75 smoke detectors, 15 heat detectors, 43 strobes, 12 chime/strobes, and 22 chimes.
DBI holds 50 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 50. 2 of them are nominal $1 street-space or sidewalk permits.