37.7285, −122.4768 A locator map appears here once a Mapbox token is configured.
Know This Place

District 7 · Block 7295, Lot 038 · ZIP 94132

Stonestown Shopping Center

3201–3251 20th Avenue · Lakeshore

  • 2 stories
  • 411,904 ft2
  • 946,865 ft2 lot area
  • Wood frame
  • Zoned C2
  • Not a historic resource
Land$89,241,524
Improvements$211,948,624
Total assessed$301,190,148
37.7285, −122.4768 Street View appears here once a Google Maps embed key is configured.
  1. November 7, 1941

    The streets beneath the shopping center site — including portions of Twentieth Avenue, Tranquilo Drive and Monte Vista Drive — were laid out on the 'Map of Merced Gardens,' filed November 7, 1941, in Book 'O' of Maps in the city's official records.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center, Renovation Project, San Francisco, California: Draft Environmental Impact Report, 1976.
  2. 1950

    Stonestown Shopping Center opened — one of the first suburban-type regional shopping centers on the West Coast.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center Renovation Project, San Francisco, California: Draft Environmental Impact Report Amendment, 1979.
  3. 1950-1952

    Stonestown Shopping Center, designed by Welton Becket.

    Architecture, Planning & Preservation Professionals: A Collection of Biographies, adopted 2021
  4. March 16, 1950

    City Planning Commission Resolution 3721, under which Stonestown Shopping Center was originally developed, was adopted; the certified covenant and preliminary site plan were approved April 27, 1950, the resolution's effective date.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center, Renovation Project, San Francisco, California: Draft Environmental Impact Report, 1976.
  5. 1951

    The first Stonestown Shopping Centre was built where the eastern part of the Galleria now stands.

    San Francisco Planning Department, Stonestown Village Project: Initial Study, Case No. 2000.1258E, 2001.
  6. 1952

    The original building at the southwest corner of the center — later the City of Paris building — and the adjacent Stonestown Market were constructed.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center, Renovation Project, San Francisco, California: Draft Environmental Impact Report, 1976.
  7. 1952

    The original building was occupied by the Butler Brothers Department Store from 1952 to 1960.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center, Renovation Project, San Francisco, California: Draft Environmental Impact Report, 1976.
  8. 1960

    The building was expanded and altered as its occupancy changed from Butler Brothers to City of Paris.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center, Renovation Project, San Francisco, California: Draft Environmental Impact Report, 1976.
  9. January 25, 1962

    City Planning Commission Resolution 5490 authorized additional commercial floor area at the center, including a second floor for an already-authorized one-story addition to the City of Paris building, a 50,660-square-foot expansion of the Emporium building and a 14,390-square-foot sixth floor on the medical building.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center, Renovation Project, San Francisco, California: Draft Environmental Impact Report, 1976.
  10. 1971

    The City of Paris department store, which had occupied the southwest building since 1960, ceased business.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center, Renovation Project, San Francisco, California: Draft Environmental Impact Report, 1976.
  11. 1972

    Liberty House took the building on a short-term lease; it moved to downtown San Francisco in April 1974 and the building stood vacant afterward.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center, Renovation Project, San Francisco, California: Draft Environmental Impact Report, 1976.
  12. 1976–1977

    The old City of Paris building at the southwest corner was demolished under the renovation project certified October 14, 1976 — cleared before the November 1977 completion of the Bullock's store built on its site.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center Renovation Project, San Francisco, California: Draft Environmental Impact Report Amendment, 1979.
  13. October 14, 1976

    The City Planning Commission voted 3-1 to authorise a three-level Bullock's department store of about 180,000 square feet in place of the vacant City of Paris store, the enclosure of the mall as far as the Emporium, a bridge over Winston Drive (Resolution 7579) and a five-level 640-car garage (Resolution 7580).

    San Francisco City Planning Commission minutes, San Francisco Public Library (Internet Archive)
  14. November 1977

    The 164,000-square-foot Bullock's department store opened on the site of the former City of Paris building, with its five-level parking garage and a second-story pedestrian overpass across Winston Drive connecting it to the mall.

    San Francisco Department of City Planning, Proposed Stonestown Shopping Center Renovation Project, San Francisco, California: Draft Environmental Impact Report Amendment, 1979.
  15. May 1987
    Permit 8706214 $$$ $35,000

    Tenant interiors, acoustical ceilings, drywall & steel studs.

  16. 1988

    Assessor’s “built” date.

  17. Jan 1988
    Permit 8800262 $$$ $850,000

    Enlarge mall public area to provide food court area.

  18. Jul 1988
    Permit 8809820 $$$ $800,000

    Tenant improvement.

  19. Jun 1994
    Permit 9408776 $$$ $4,900

    Tenant improvement@ stonestown galleria.

  20. Jun 2004
    Permit 200406085812 $$$ $646,425

    Remodel of interior sales area & fitting rm areas. remodel of existing store front-sprinkler & life.

  21. Jan 2007
    Permit 200701161707 $$$ $1,000,000

    Provide interkor tenant imporvement at 2nd floor per paln. remove doors and partition wall. provide new partition walls, doors, ada restsroom ada lifting interior storegfront sinage under separate permit mep under separate permit.

  22. May 2012
    Permit 201205160614 $$$ $3,300,000

    Proposed 3 level fitness ctr occupying an existing 54, 000 sq ft (3) level building. fitness ctr will consist of arears for weight training cardio & circuit trainging, basketball, racquetball, lap pool & spa. area for new membership sales & child care also provided. fire sprklr, alarm & signage under sep permit.

  23. Jan 2013
    Permit 201301037125 $$$ $800,000

    Gap retail store at 1 story. tenant improvement-change rooms at retail. fire alarm & fire sprinkler under separate permit.

  24. Mar 2013
    Permit 201303202673 $$$ $1,937,000

    T.i. of existing space. work includes non-structural partitions, ceilings, finishes, furniture & structural work. sprinklers, fire alarm, signage, storage rackes, mechanical, electrical & plumbing under separate permits.

  25. Jun 2013
    Permit 201306260530 $$$ $1,447,000

    Space #148 new tenant improvement "uniqlo" (10, 586 sq ft), framing, framing, finishes, electrical, mechanical, plumbing.

  26. Sep 2015
    Issued Permit 201509015838 $$$ $1,200,000

    Installation of canopy support over parking structure for photo voltaic arrays.

  27. Feb 2016
    Permit 201602260662 $$$ $2,200,000

    #1062- t.i. for existing retail store to include new partitions, fixtures, finishes, ceilings, lighting, mechanical, new fitting rooms, ramps & stairs. no exterior work, fire protection under seperate permit.

  28. Apr 2016
    Permit 201604053958 $$$ $325,000

    Ti for space 129, 130, 132 partitions, mep, shelving, stonestown mall. ab -56 compliance 2014-0627-9771.

  29. Feb 2017
    Permit 201702028499 $$$ $1,500,000

    Space 104 - standard interior fit-out of single sotry irregular shaped retail space totaling 25, 075 sq ft. mep included. no building structural upgrades proposed.

  30. Nov 2017
    Permit 201711224699 $$$ $3,340,937

    Mall exterior improvements reconfigure the site & western mall entries @ the north end of the mall. project scope is for demolition & rebuilding of the level 2 west mall entry; addition of (1)new entry @ level 1; modifications to hardscaping, planting & parking.

  31. Feb 2018
    Permit 201802201700 $$$ $6,697,016

    Renovate mall interior -reconfigure common area adjacent to anchor building- stairs, ramps, new floor openings.

  32. Dec 2021
    Withdrawn Permit 202112013378 $$$ $812,000

    Suite# op109: change occupancy from restraurant to lending institution. t.i. including: exterior storefront with structural columns & headers, interior non-bearing partitions, millwork & interior finishes, electrical power & lighting, mechanical distribution, plumbing fixtures.

  33. Jan 2022
    Permit 202201055406 $$$ $800,000

    #op186: t.i. existing restaurant mall location, ext shell modifications. mep incl. structural work incl in relation to new rooftop units. interior partitions and shell modifications. demolition. signs, fire alarm/sprinklers/hood & duct suppression system deferred.

  34. Jan 2022
    Permit 202201316962 $$$ $812,000

    Op190: change occupancy from restaurant to lending institution. t.i. including exterior storefront with structural columns & headers, interior non-bearing partitions, millwork, & interior finishes. mechanical, electrical power & lighting. plumbing fixtures. deferred fire & signage.

  35. Aug 2022
    Permit 202208090186 $$$ $400,000

    Space 267: tenant improvement for new retail store, 5250 sq ft. restroom (no underground work) - relocation of sink for ada code.

  36. Oct 2022
    Issued Permit 202210265224 $$$ $60,000

    Remodel of existing retail sales area work includes the replacement of existing sales area fixtures and finishes and addition of a video wall.

  37. Jan 2023
    Permit 202301200474 $$$ $780,000

    Ste #266- interior t.i. of a retail open sales area: new fitting rm partitions, new partition wall at back of house, mep included, minor structural.

  38. Apr 2023
    Permit 202304115472 $$$ $750,000

    Space 360: 2/f: new t.i. of clean vanilla box interior space, upper level of existing mall, new interior build-out & finishes. mall concourse scope limited to new storefront, signage under separate permit.

  39. Jan 2024
    Permit 202401184225 $$$ $1,000,000

    Interior tenant improvement for a restaurant in existing retail space. change of use from retail to restaurant.

DBI holds 1,831 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 1,831. 2 of them are nominal $1 street-space or sidewalk permits. 1 expired permit is not shown. A citywide context statement dates a building at this address by Welton Becket to 1950; the assessor's roll dates the structure on this parcel to 1988. Whether the building described still stands here is unsettled. The center's environmental reports disagree on dates: the 1976 draft dates the original building and the adjacent Stonestown Market to 1952, while the 1979 amendment says the shopping center opened in 1950. The environmental reports treat the shopping center as one site across assessor blocks 7295 and 7296; this parcel is on block 7295.

Nearby