Harding Park Golf Course
1–99 Harding Road · Lakeshore
-
1925
The 18-hole Harding course at Harding Park was built, to the design of William Watson.
-
1934
The Harding course was redesigned by Jack Fleming.
-
1935–1941
The Works Progress Administration built the wood-frame golf clubhouse at Harding Park.
-
May 2000
The golf course clubhouse at 99 Harding Road went by the name Harding Park Golf Course Club House.
-
Jan 2003
Erect a one story maintenance facility.
-
Jan 2003
Erect a one story storagewashdown building.
-
Aug 2004
Underground fire water pipe installation per plan.
-
Jun 2005
As part of permit application 2003/01/23/5804. this addendum is being submitted to install an above ground fueling.
-
Sep 2005
Set up of temporary tents (90) on existing driving range fist tee driving range, holes 1, 4 fairway, 6.
-
Jul 2009
Temporary tents for (4) days event at harding park.
-
Jul 2009
Temporary tents for 4 days event at harding park. trophy suites.
-
Aug 2010
Temporary tents for 4 day event at harding park.
-
Jul 2011
Temporary tents for existing day event @ harding park/charles schwab cup championship.
-
Apr 2013
Temporary bleachers for event at harding park, charles schwab cup championship.
-
Feb 2015
Temporary tee stands and tents for world gold championship. cadillac match play hospitality venues.
-
Feb 2020
Install temporary tents, bleachers, office trailers for 7 day golf event at harding park. 2020 pga champtionship. may 11-17 2020.
-
Mar 2021
The scope of work is to perform an emergency fire alarm control panel replacement. all notification appliances are existing and remain unchanged. all initiating devices are existing and remain unchanged. one new remote annunciator shall be installed.
-
Mar 2022
Priority process - new building construction recreation center.
-
May 2023
Temporary structures built for merchandise, hospitality and public bleachers. 1-public bleacher, 1-merchandise tent, 1-volunteer tent, 3-hospitality tents, 3 concession tents, 1-admission tent, 1-first aid tent. from 5/4/2023 to 5/7/2023.
-
Nov 2023
Ref 202203029071 s1 & 202311140753 mep work only: new mechanical equipment-variable refrigerant flow system with fan cools and air cooled outdoor condenser heat pump. outside air ventilation is provided by energy recovery unit. (erv) new ductwork, piping and air distribution. life safety deferred.
-
Jan 2024
Parking lot and pathway renovations to enhance ada compliance at at harding park golf clubhouse and parking lot. ada barrier removal project consists of demolition, minor grading, concrete asphalt paving, landscape planting and irrigation, electrical, paitning, installation of site furnishings and signage.
-
Mar 2024
Install new fire alarm system in non-sprinklered building to comply with 2022 cbc/cfc, nfpa 72. new facu with radio to monitor system. smokes in common areas and pulls each exit. horn/strobes in common areas.
-
Mar 2024
Installation of (2) 1500 gallon septic tanks serving new golf-learning center. reference permit application 202203029071.
DBI holds 39 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 39. 5 expired or cancelled permits are not shown.