2501–2515 Ocean Avenue
Lakeshore · San Francisco, CA 94132
Permit history
-
Feb 1988
Remove portion of entrance stops & replace with handicap ramp.
-
Apr 1988
Demolition & remove non-structural elements @ bsmnt & 1st floor.
-
Apr 1988
Interior improvements, metal stud, gypboard walls, s/ceiling.
-
Jul 1988
Repair dry rot work as required on south side exterior wall.
-
Sep 1991
Reroofing.
-
Dec 1999
Repalce post according to plan & ramp/6" curb at front.
-
Aug 2000
Rplace post according to plan revis permit permit application 9926374 for final.
-
Feb 2011
Repair to exterior wall damaged by vehicle impact to replace 2 cripple blocks, 2x blockage 1st 3 bay on vaener brick wall.
-
Mar 2011
Reroofing.
-
Sep 2011
Structral strengthening @ 1st floor, 2nd floor, attic, basement. arch items as related for the above. new fire alarm system & minor electrical. items. ada as req. (20% const cost) new finishes.
-
Apr 2016
Interior soft demolition of exist. sheetrocks and ceiling tiles. vacant space. all structural elements to remain. work per ab 017.
-
Sep 2018
Change of occupancy use of 2nd fl from office to residential & roof deck @ 2nd fl & roof to open common use space. new roof stair penthouse & ada & egress/access from 1st to 2nd fl. add bike storage for r-2 @ existing 1st fl area.
-
May 2021
T.i. of 1st and 2nd floors. install 2 new bathrooms on first floor and 1 new bathrooms on 2nd floor. existing medical office to remain on 1st floor. 2nd floor change to accounting. mep deferred.
-
Sep 2021
Revision 202105271214. voluntary strengthening to add beams and posts to reinforce floor joists.
-
Sep 2021
Installation of (109) fire sprinklers throughout the building. accoding to app 202105271214 per nfpa 13 & underground piping per nfpa 24 (trench backfill and sidewalk repair by separate permit.
-
Dec 2021
Installation of new sprinkler monitoring system ref. sprinkler permit application 202109299482.
-
Jun 2023
T.i. for new cafe. interior remodel of partitions, plumbing fixturs, lighting and finihes. new kitchen, new counter, new finishes and fixtures througout existing ada bathroom will remain.
-
Jan 2024
Ti to existing commercial unit. add new exterior security gate at main building entrance. no other, no structural, no work in public right of way.
-
Jul 2026
Recommencement and completion of work approved under permit application 202306291168.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update