2305–2499 Golden Gate Avenue
Lone Mountain · San Francisco, CA 94117
-
Jan 1982
Sign - erect.
-
2000
A residence hall on the University of San Francisco campus named for Burl Toler, the educator and the first African American official in the National Football League.
-
May 2002
Renovate existing 5 story, 40, 000, office building, faculty and staff offices, upgrades and site work.
-
Jan 2004
Remove e entry canopy & construct new 6056 sq ft entry structure consisting of 2 levels and mezz at fro.
-
Jun 2005
Renovation of existingg/f including office spaces, chapel area, accessory & service areas within the a3 and.
-
Apr 2006
Seismic upgrade & structural work on campion & cowell hall in advance of t.i.
-
Aug 2006
New bridge structure to merge 2 building (campion & cowell halls) with passage on 2nd 3rd and 4th floors work also includes t.i. in campion hall including seismic upgrades new partitions doors etc 2 story gill theatre to be infilled with additional floor t.i. at cowell hall on g/f only structural work.
-
Feb 2007
Renovation of existing bathrooms & tenant improvements on floors 2 thru 5.
-
Apr 2010
University of sq ft. ti for entire 4th fl of univ. offices. work includes new partition fixtures, finishes. new restrooms. new mep. fire protection under separate permit. no exterior work. no increase in office space.
-
Jul 2010
Ti for ground floor of univ. student center incl. remodeled existing bookstore, cafe, offices and ada bathrooms. work includes partitions, ceilings, flooring, new mep. no exterior work. fire protection under separate permit. demolition ti approved under 2010.05.18.2698.
-
Aug 2010
To erect 4 stories education building.
-
Jan 2011
Internal remodel to existing dorm washrooms and new r.a. apartment and reading room + open lounge.
-
Mar 2011
Usf phelan hall. for limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story building. local structural member strengthening. no change of occupancy (per general portion of asce-41 procedure with certain exceptions). see engineer's statement dated 4-18-11 attached.
-
Jan 2012
Interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms.
-
Feb 2012
Interior remodel of basement, ground floor and 1st floor. work to include restroom upgrades, new finishes and dorm room remodel. existing residential dorms on the basement level, ground floor and 1st floor. no change of use.
-
Jul 2012
Accessiblity entry upgrade with elevation & internal renovations. mep under separate permit. include new entry steps to existing exterior & new curtain wall system & 1st floor north side. demolition existing office & restroom & install new replacement accessible restroom & relocated.
-
Jun 2015
Erect one-story fire sprinklered recreation building.
-
Jun 2015
Removal of existing field turf & subsoil, new baseball field set at 1 or 2 feet lower elevation; new field to be synthetic turf with fill, sub-drainage, liner to meet sfpuc requirements.maher ordinance n/a.
-
Mar 2016
Int. alterations to existing building; minor vol. seismic strengthening of building structure; voluntary remodeling of existing public rstrms; addition of a new elevator serving all floor levels; replace certain existing building mechanical equip., no ext. alter. & no added or removed existing building sq ft. under this scope of work.
-
Nov 2016
Addition of below grade storage & equipment rooms to war memorial gymnasium; 718 ground square footage addition. ** maher: n/a **.
-
Nov 2018
Addition of approx 4, 900 sq ft. reconfigure west side upper level to create new west entry lobby, southwest corner & club/event space. will reduce total seating capacity by approx 650. minor alteration to south entrance & interiors of north & south lobbies are included.
-
Oct 2019
Interior demolition & renovation of a portion of the ground & 1st levels to create new maker spaces, lounge & office. ** maher: n/a **.
-
May 2020
Improvement of existing gym seating area that adds ada seating, food warming area, beverage counter and one all gender restroom.**maher n/a**.
-
May 2021
Construct new approx 15, 600 sq ft addition, 45-ft basketball practice facility on the usf lower campus. 1 full basketball court, 2 partial shooting/drills courts, coaches' offices, conf rms, restrms, & storage room.
-
Jan 2022
Revision to 201910083932, revision to ground floor plan and associated elevations/details and equipment list. added shafts, including related structural reinforcing for existing slab, from gr fl to roof for dust collection system located on gr floor and laser cutter room located on level one.
-
Jul 2022
New micropile supported foundation to support future gymnasium - under separate permit permit application 202105210845.
DBI holds 379 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 379. 48 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update