450–460 Stanyan Street
Lone Mountain · San Francisco, CA 94117
-
1972
St. Mary's Hospital, designed by Hertzka & Knowles.
-
Nov 1991
Exavation & grading.
-
May 1992
Replace existing retaining wall, add undergrnd. storm drain.
-
Jun 1992
Sprinkler work as shown on plans.
-
Dec 1995
Concrete foundation pad & related footings, retaining walls.
-
Mar 1996
Install sign per plan & cu attached.
-
Mar 1996
To erect electric double faced sign.
-
May 1996
Addition of alum. framed windows between existing steel tube fram.
-
Feb 1997
Provide equipment room in existing enclosed mechanical roof.
-
Jul 2009
Approx. 330 linear feet of direct bury piping-(2) 4" chilled water lines & (2) 3" heating/hot water lines to be installed below existing driveways with connections to existing stub-outs outside of existing buildings.
-
Apr 2010
Add 42 sprinkler heads at 6th floor.
-
Feb 2011
Modify existing fire alarm system on 1st fl. add 3 new relays to tie new door operators into fa system. add 1 new door hold and tie into existing door hold circuit. new smoke detectors on both sides of ea set of doors with new operator's dor hold.
-
Mar 2011
Existing three antennas to be relocated from east face to north face of existing building. application for all other work under review by oshpd.
-
Apr 2012
Install 2 illuminated wall signs at top level of building.
-
Dec 2013
3rd floor; medical office building tenant improvement in an existing building, 3rd floor only. compliance with ordinance no. 155-13 not required.
-
Mar 2014
3rd floor: install new extender panel in new data room. install new smoke above booster. install 3 new duct detectors to 3 new fsd's. 3 new pull stations at each exit, monitor 1 water flow and 1 valve tamper, 17 new strobe lights and 6 new horn/strobes.
-
Apr 2014
Install sprinklers on floors 2, 3, 4 existing system. includes tenant work at suite 405. connect at 4" standpipe in east stair. total sprinklers on 2nd floor 158 and 3rd floor 121. 4th floor 135.n/a for the maher ordinance #155-13.
-
Jun 2014
Removal of currently unoccupied space into an ultrasound doctors office.
-
May 2015
Temporary microwave dish (15" in diameter) to be installed on the rooftop of st. mary's hospital from 5/13/15 to 5/19/15 for "verizon wireless". n/a maher ordinance.
-
Dec 2016
Remodel on the 3rd of an existing 6 story medical office building. maher na.
-
Dec 2016
Ada barrier removal. ** maher: n/a **.
-
Jan 2017
Ada barrier removal at mri building. ** maher: n/a **.
-
Mar 2017
Fire alarm new strobe lights and replace 1 existing corridor strobe light with new horn strobe; bpa#201612155060.
-
Apr 2018
4 existing idf rooms, low voltage cabling for existing idf closets, new ac-0 and ac-1.
-
Mar 2019
Minor modification to fire life safety system addition of 1 spot smoke detector.
DBI holds 37 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 37.