450–460 Stanyan Street
Building · Lone Mountain / USF
-
March 31, 1908
Harrelson-Grau company contracted for concrete retaining walls for the first St. Mary's Hospital on this block, for the Sisters of Mercy, at $5,155.
-
April 2, 1910
The first St. Mary's Hospital on this block was designed by D. H. Burnham & Co.: in the mission style with red tile roofs, with three more wings and an administration building to follow. The land, 412 1/2 feet on Hayes and Grove and 275 feet on Stanyan and Shrader, cost $125,000.
-
April 3, 1910
A builder contracted for the concrete fireproofing and cement work of the first St. Mary's Hospital, on the corner of Hayes and Stanyan streets.
-
August 8, 1968
St. Mary's Hospital owned the land on both sides of Grove Street between Stanyan and Shrader Streets; the hospital held 433 beds in buildings including ones built in 1952 and 1960. St. Mary's Hospital had recently built a parking garage intended for its employees, charging 50 cents an hour and closing at 10:30 P.M. The City Planning Commission approved, with nine conditions and on a 4 to 1 vote, the expansion of St. Mary's Hospital to a medical center of up to 630 beds, with a nursing tower of no more than nine stories above a two-story base built partly over vacated Grove Street.
-
1972
St. Mary's Hospital, designed by Hertzka & Knowles.
-
Nov 1991
Exavation & grading.
-
Jun 1992
Sprinkler work as shown on plans.
-
Jul 2009
Approx. 330 linear feet of direct bury piping-(2) 4" chilled water lines & (2) 3" heating/hot water lines to be installed below existing driveways with connections to existing stub-outs outside of existing buildings.
-
Apr 2010
Add 42 sprinkler heads at 6th floor.
-
Apr 2012
Install 2 illuminated wall signs at top level of building.
-
Dec 2013
3rd floor; medical office building tenant improvement in an existing building, 3rd floor only. compliance with ordinance no. 155-13 not required.
-
Mar 2014
3rd floor: install new extender panel in new data room. install new smoke above booster. install 3 new duct detectors to 3 new fsd's. 3 new pull stations at each exit, monitor 1 water flow and 1 valve tamper, 17 new strobe lights and 6 new horn/strobes.
-
Apr 2014
Install sprinklers on floors 2, 3, 4 existing system. includes tenant work at suite 405. connect at 4" standpipe in east stair. total sprinklers on 2nd floor 158 and 3rd floor 121. 4th floor 135.n/a for the maher ordinance #155-13.
-
Jun 2014
Removal of currently unoccupied space into an ultrasound doctors office.
-
May 2015
Temporary microwave dish (15" in diameter) to be installed on the rooftop of st. mary's hospital from 5/13/15 to 5/19/15 for "verizon wireless". n/a maher ordinance.
-
Dec 2016
Remodel on the 3rd of an existing 6 story medical office building. maher na.
-
Dec 2016
Ada barrier removal. ** maher: n/a **.
-
Jan 2017
Ada barrier removal at mri building. ** maher: n/a **.
-
Mar 2017
Fire alarm new strobe lights and replace 1 existing corridor strobe light with new horn strobe; bpa#201612155060.
-
Apr 2018
4 existing idf rooms, low voltage cabling for existing idf closets, new ac-0 and ac-1.
-
Mar 2019
Minor modification to fire life safety system addition of 1 spot smoke detector.
DBI holds 37 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 37. 8 expired or cancelled permits are not shown.