2500–2800 Turk Boulevard
Lone Mountain · San Francisco, CA 94118
-
1932
Lone Mountain College for Women, designed by architect Henry A. Minton in an elaborate Baroque Revival style.
-
Jun 1997
Erect a five story 23 unit apt building.
-
Oct 1998
New fire sprinkler system.
-
Mar 2006
Remove existing glass entry & construct new entry colamade. ref to previous permit application 2005/08/10/9898 for title 24 access complete dated: 09/21/05.
-
May 2006
Renovation of existing elevator lobby areas to floors 4 through 7. to correct existing lobby/elevator code infranction.
-
Jan 2007
Renovation of existing building on floors 4 through 7 of bathroom and dorm rooms.
-
Feb 2007
Emergency panel replacement for usf-lone mountain, panel replacemnet-fire alarm system.
-
Nov 2016
(east building) to erect 4 stories with 1 basement, type va building, 84 units student residence hall with amenity office. (r-2, b, a-3, s-2).
-
Nov 2016
(west building) to erect 5 stories, no basement with 1 level type i-a over 4 levels type 5-a, 71 units student residence hall with amenity office. (r-2, b, a-3, s-2).
-
Dec 2016
Replace 2 steam boilers with 2 new hot water boilers. install 2 microturbine units. install new hot water distribution piping throughout building. replace radiator steam coils with hot water coils in existing radiator enclosure. misc arch finish repairs. no work outside building except for piping on top of roof.
-
May 2017
Replacement of 186 windows at east wing only - phase 1 new windows - max u-factor =0.32.
-
Oct 2017
Interior renovation of existingdinning hall within existingeducation building; include partitions, cooler boxes, food service equip, storefront windows & doors, & mep. erect new dining hall pavilion & covered pedestrian walking.
-
Nov 2017
Accessibility upgrades consisting of the removal of an existing non-compliant ramp on the 1st fl along with corridor and adjacent office plan re-configurations to accomodate new ramp length, fire under separate permit(s).
-
Feb 2018
Replacement of 205 windows to west, tower, chapel wings & main. phase ii. max. u factor not to exceed 0.32. like for like.
-
Apr 2018
Demolition of a type 4, 1-story maintenance building for usf campus.
-
Jun 2018
Grub & removal of vegetation, trees & debris. removal of ac & concrete. removal of fencing & light poles & cap utilities. ref 201611303815s & 201611303820s, 201804095853 demolition. exclude excavation & grading work.
-
Jun 2018
Design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref permit application 2016/11/30/3815-s (east building) & permit application 2016/11/30/3820-s (west building).
-
Jun 2018
Design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref permit application 2016/11/30/3815-s (east building) & permit application 2016/11/30/3820-s (west building).
-
Jul 2018
Putting an 8' wood fence at turk street in the usf property. temporarily for new housing construction.
-
Aug 2018
Utlities corridor from turk to the buildings. collection of stormwater from the buildings to the stormwater infiltration field. pg&e joint trench (electric & gas) is by pg&e.
-
Feb 2019
Installation of approx 700 linear feet of 8" and 6" fire pipe hydrant and fire dept conection for 2 proposed buildings.
-
Jul 2019
1 tower crane erection.
-
Aug 2019
Rev to 201710110911.accom prop arch layout-new openings will add to existingconcrete wall with remain portion wall strengthened by inc thickens of wall&infillexistingopening by casting new concrete against existingwall&tying 2 walls together via epoxy dowels.
-
Nov 2019
Provide a fire protection system on the dining commons level of the existing lone mountailn building and in the newly constructed pavillion building, all existing stand pipes and controls beyond area of work are to remain (37) new pendent heads, (93) new upright heads, (3) ne side heads.
-
Aug 2020
Furnish and install 4 pyro chem fire systems in the main kitchen area on the ground floor.
DBI holds 72 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 72. 10 of them are nominal $1 street-space or sidewalk permits.