781 Beach Street
Marina · San Francisco, CA 94109
Permit history
-
Nov 1981
Additions alterations or repairs.
-
Apr 1983
Additions alterations or repairs.
-
Apr 1986
Tenant improvements enalrge art gallery.
-
Sep 1990
Remove existing floor remove some aprtitions, add new one.
-
Oct 1990
Expansion of existing non conforming bathrooms.
-
Jan 1991
Parapet bracing.
-
Jun 1991
New interior tenant stair between & 3rd floor.
-
Jul 1991
Cti 1 floor 3rd.
-
Jul 1991
Cti ii floor 3rd.
-
Jul 1992
Reroofing.
-
Dec 2006
Installation of 2 mcro panel antennas mounted on existin uilding wall painted to match with the associated equipment cabinet sorrounded on convete wall at roof level.
-
Mar 2008
Provide new storefront & entry doors at building facade. remove & repalce existing interior storefront with new. replace existing entry ramp with new stairs and accessible lift.
-
Mar 2008
2nd floor: demolish existing interior non-load bearing partitions, door assemblies, finishes, ceilings & light fixtures within area of work, use ab-017. demolish work only.
-
Apr 2008
Remove 4 non-load bearing walls. cut existing wall to 54". install new carpet, new electrical & new sink.
-
Apr 2008
Demolition 4 non-load bearing walls. remove carpets and 1 interior window on the 3rd floor. space to remain unoccupied until future ti per ab 17.
-
Apr 2008
3rd floor-provide new unisex accessible restrooms with shower, new finishes and ceiling in restrooms. relocate suite entry door. mep under seperate permit.
-
Apr 2008
Cut ex. non-loadbearing partition wall down to 54", in-fill ex. pass through, install new counter top and sink in breakfast room and install new glass partitions.
-
Apr 2008
Cut existing wall to 54". infill existing pass thorugh. install new carpet, install new counter top, new sink, new glass partitions.
-
Dec 2014
3rd fl. build two interior offices a new server room. install dishwasher, new lites (led), plugs, switches, new kitchen cabinets and replace 10 doors. maher n/a.
-
Jan 2015
3rf floor: modify ducting to accomodate the new floor plan. install new aic for server room. ref. appl. 2014.1205.3153. maher n/a.
-
Mar 2016
Fire sprinkler alarm monitoring service on 1st floor. maher na.
-
Mar 2017
Interior renovations of existing spaces into museum with accessory retail; new restrooms, breakroom, archival storage, library, workshop and administrative office. maher n/a.
-
Jul 2017
Pendant protection for existing uprights. relo 60 heads. ref. #2017-0329-2676.
-
Jul 2018
2nd floor: ti: new partitions, finishes, lighting & ele. restrooms: accessibility upgrade, finishes, ele & lighting & plumb. mep/fire/life safety under seperated permit maher na.
DBI holds 32 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 32. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update