1760–1770 Filbert Street
Marina · San Francisco, CA 94123
-
between 1945 and 1952
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
Jul 1982
Building use: apts.
-
Oct 1990
Reroofing.
-
Dec 1993
Tear off lath & plaster 4 bathroom, replace dry rot shhetrock.
-
Mar 1994
Remodel 4 baths with new tubs shower valves & sheetrock.
-
Aug 1996
Remove existing single glazed aluminum windows.
-
Aug 2005
Replace exisiting sub standard foundation with reinforced foundatkon according to plans by mercery engi.
-
Dec 2006
Structural upgrade at the existing ground level only. remove all the dry rot posts & beams and provide a new steel beam and posts. interior work. to comply with his nov 200234278 dated 10/29/2002.
-
Jan 2007
Install new garage door and provide new curbcut and convert existing storage to garage. (partial) change in use s1/r1 to s1/r-1/u-1.
-
Nov 2007
Interior remodel to expand one unit into existing storage area. chanse from s-3 to r-1. reconfigure two units at 2nd floor. mep, fire alarm, fire sprinkler under sep.app.
-
Jan 2008
Replace existing wood deck on 2nd floor only due to dry rot on both sides of property. no change in size or location.
-
Apr 2008
In kind repair of existing exterior wood stairs, guardrails and landing due to dry rot. no change in size or location, comply with nov# 200234278 dated 10-29-02.
-
Apr 2008
Revision to permit application 2006/12/18/9999 to reconfigure rear portion of garage for ex. lower condition. provide new steel beams and perimeter footing.
-
Oct 2008
Install new sprinkler system (includes 4" dip underground) 97 heads.
-
Oct 2008
Comply with notice of violation 200859731. expand garage at first level to east property line. construct new deck and parapet wall above expanded garage. 03/18/10: boa#09-123: denies the apeal and orders the issuance of the permit by dbi revised plans not required suspension may be lifted.gjs.
-
Mar 2015
Two units: interior remodel to relocate bathrooms and kitchens per plan. comply with complaint #200234278.
-
Sep 2016
Soft story retroit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. comply with soft story requirements, upgrade to existing foundation. including addition of new plywood diaphragm on 1st floor and welding reinforcing steel to existing vertical posts.
-
Nov 2016
Demolition of existing walls, windows, doors, finishes and fixtures, and replacement with new including kitchens and baths for two units. see structural drawings for structural scope of work. mechanical, electrical, plumbing under separate permits.
-
Mar 2017
Installation of fire sprinklers (166 heads) to nfpa-13 in 2nd and 3rd fl. 1st fl garage already sprinklered. ref 2016-1114-2580.
-
May 2017
Revision to 2015.0330.2250 to include replacement of vinyl windows and wall framing. no change to approved floor plan or structure. new windows are aluminum wood clad, in-kind. same size, same location.
-
Jul 2017
Demolition of existing walls, windows, doors, finishes and fixtures and replacement with new including kitchens and baths for one unit c, d, e, f, g and 1770 e and f level 1st floor walkway with clear heart redwood or equal decking on pedestals and relocation of entry gate. mep is deferred.
-
Jan 2018
Like for like fire system replacement & upgrade with new control panel. heat det & pull station at the same location. install radio comm, power supply panel. lf squence in every unit. monitor modules to tie in flow & tampler switches ref permit application 201703131355, 201609157859.
-
May 2022
The project proposes a vertical addition with a roof deck above the top level. the project also includes the addition of eight adu units with two units at the first floor in unused storage space and six units located on the new, proposed fourth floor per the local adu program.
-
Oct 2022
1770 unit g & h: demolition of existing walls, windows, doors, finishes and fixtures. replace with new including kitchens & baths. mep desigh build under separate permits.
-
Jun 2023
One unit: one kitchen and one bathroom remodel. all work in-kind and no layout changes.
-
Apr 2026
Installation of a 150a meter main panel to service the installation of (8) level 2 (20 amp) ev chargers.
DBI holds 60 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 60. 12 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update