1900 Jefferson Street
15-unit apartment building · Marina
-
1930
Built.
-
July 12, 1930
A permit was sought for a three-storey frame building of fifteen apartments with a basement, estimated at $40,000. Irvine & Ebbets were named as architects.
-
Mar 2004
Reroofing.
-
Aug 2018
Demolition existing lath and plaster at four units. total approx 1200 sq ft of plaster to be removed from all 4 units for existing structural elevation.
-
Jan 2019
Replace existing wood windows with new aluminum clad wood windows throughout (93 total, not including arched windows at top) in existing openings, same operations. existing windows in lightwells to be replaced with new vinyl windows (48 total).
-
Feb 2019
Upgrade fa system for 1103.7.6.1 compliance ref 201808228021.
-
Aug 2019
One unit: interior rmeodel of existing 1 bdrm to become 2 bedroom unit. relocate existing kitchen, remodel existing bathroom and addition of powder room. n/a maher.
-
Jan 2020
Two units: remove existing lath & plaster from unit, structural evalutation. replace with 5/8in sheet rock, approx 900sf.
-
May 2020
Remove e lath and plaster from two units for structural evalucation. replace with 5/8 sheetrock. type x approx 900 sq ft unit.
-
Jun 2020
Complete remodel of three existing onebedroom apartments located on the 2nd, 3rd and 4th floor of a four-story 15 unit apartment building. remodel will result in conversion of the units from one bedroom to threebedroom, two bath units.
-
Jun 2020
Addition of five (5) new adu's (three one bedroom units and two studio units) in the garage of a four story multi-family 15 unit building.
-
Jul 2020
One unit: remove existing lath & plaster from one unit for structural evalvation. replace with 5/8 x sheetrock.
-
Aug 2020
Reroofing - waterproof 1, 500 square feet of clay tile roofs using one ply of the lyon guard wip 300 high performance water-proofing underlayment. reusing old clay tiles except the broken ones, which will be replaced in-kind.
-
Sep 2020
Three units: reconfiguring interior partitions new electrical, lighting & plumbing. existing steam radiant heating to remain as-is. no change to exterior, building footprint, height, or gross area. maher na.
-
Oct 2020
Remove lath & plaster for structural evaluation 400 sq ft, replace with type x sheetrock. one unit.
-
Dec 2020
#202 & #305: reconfigure interior partitions. #202 changes from 1 bed 1 bath to 2 bed 1 bath. #305 changes from 1 bed 1 bath to 3 bed 2 baths. new electrical, lighting, plumbing.
-
Apr 2021
Revision to app#202006068205. steel beam to timber beam.
5 nominal $1 street-space or sidewalk permits are omitted from the timeline. 3 expired or cancelled permits are not shown.
Nearby
- 1895 Jefferson Street Same street
- 1935 Jefferson Street Same street
- 1954–1956 Jefferson Street Same block
- 611 Marina Boulevard Same block
- 601 Marina Boulevard Same block
- 627 Marina Boulevard Same block
- 3733–3737 Divisadero Street Around the corner
- 3748–3750 Divisadero Street Around the corner