2770 Lombard Street
Marina · San Francisco, CA 94123
-
1926
Built.
-
August 24, 1949
Photographed.
-
Sep 1983
Gut building.
-
Aug 2012
Fire alarm panel replacement, replace edwards 1526 facp with silent knight 5208, add 1-syst sensor 2wb smoke alarm to new facp. no existing smoke det. note: this panel was install prior to permit issuance. fire inspector to field verify install and 100% test all existing devices and 100% functionality.
-
Jul 2018
Window replacement. repair & replace of roof, gutters & downspouts. stucco repair. replace exterior paving & planting. fountain repair.
-
Feb 2019
Reroofing.
-
Sep 2019
Response to notice of enforcement# 2019015839 enf. chimney tops removed & rebuilt lower due to structure concerns. chimneys rebuilt using similar design & location preserving look & feel to previously existing. ** maher: n/a **.
-
Sep 2019
Response to notice of enforcement# 2019015839 enf. inkind patch & repair using same material & texture to match existing condition in preparation for painting. ** maher: n/a **.
-
Dec 2019
Installation of exterior ornamentation to restore historical characteristics of the building. maher na.
-
Dec 2019
Exterior improvements: replace concrete paving with unit pav, planting, exterior landscape lighting & exterior fountain, paving, steps & railings. install site furnishings. reconfigure existing irrigation.
-
Nov 2024
Upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1, ab# 3.08, ab# 2.01 & 2022 cfc, cbc & nfpa 72-2022. replacement of fire alarm system shall be automatic & manual system with one pull station located next to the facu since the building has a fully sprinklered system.
-
Nov 2024
Rev 201912300982- stairs to be repaired in kind.( less than 50%).
-
Apr 2025
As built to permit application 202411054410. change facu panel from 4007es to 4100es. add a device address to all idnac repeaters and update equipment list, calculations.
-
Jul 2025
One unit: replace countertop in kitchen and bathroom.
-
Aug 2025
Revision to permit application 2019-1230-0982 revision 5 removes the east court from the scope of work.
-
Sep 2025
One unit: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitchen & bath remodel.
-
Sep 2025
One unit: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitchen & bath remodel.