3301–3601 Lyon Street
Marina · San Francisco, CA 94123
-
1938
The Palace of Fine Arts, built of wood, lath and plaster as a temporary structure for the 1915 Panama-Pacific International Exposition, was shored up, patched and repainted by Works Progress Administration workers in about $54,000 of repairs.
-
May 1992
Minor earthquake repairs to theater portion.
-
May 1992
Minor earthquake drpeiars to museum portion (exploratorium).
-
May 1993
Seismic upgrade of structure fr interior #9208236 & 9208237.
-
Sep 1993
Revision #9307210-change some structural details (per plans).
-
Nov 1993
Bathroom accessability upgrade men's & women's toilets.
-
Apr 1996
Lay new floor, construct divider wall.
-
Apr 1997
Construct new sewer line.
-
Apr 1997
Remodel of exploratium cafe.
-
May 1997
Constructing addtional restrms with c are ada complaint.
-
Jul 1997
Install partitions walls.
-
Aug 1997
Add/relocate fire sprinklers. add fire sprnklr to new rstrm.
-
Oct 1997
Construct new steel mezzanine with steel sub-deck & plyw'd floor.
-
Oct 1997
Install fire alarm.
-
Jan 1998
Install fire sprinklers.
-
Apr 2000
Replace a piece of dropped plaster ceiling of the rotunda install 12" diam ventilators on top.
-
Mar 2004
Install rotunda safety system & roof repair.
-
Dec 2004
Voluntary barrier removal, revise the seating area for wheel chair access & handrails to code.
-
May 2005
Palace of fine arts lagoon & park restoration work: concrete wall at lagoon edge, sheet piling for.
-
Jan 2006
Installation of total pac2-preaction system for new server room.
-
Mar 2007
Monitoring of new preaction panel via existing fire alarm panel. preaction system under 200601091470.
-
Jul 2007
Selective structural upgrade, concrete repair, cleaning, new roof, new electrical, building pedestrian lighting, new landscape including grading, paving, planting, irrigation.delete column core drilling from selective structural upgrade via addendum #2 9/6/07 attached.
-
Feb 2016
Add ada compliant counter to cafe within the larger property (palace o f fine arts). add security shutter replace 3 comp sink and water heater. maner na.
-
Jun 2026
Att: install 90' faux eucalyptus tree with 16 new antennas, 12 new rrus, 4 new surge supressors, 1 new cabinet on new concrete pad, new concrete pad for future generator, new 400a meter & new 400a sub panel, new cru block wall.
-
Jul 2026
Remove circular structure (breakout room #1/#2) & mezzanine above located in interior atrium space. replace structure with stair & viewing mezzanine (to be connected to existing mezzanine).
DBI holds 39 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 39.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. The roll classes this parcel as a vacant lot and also gives it a build year of 1900. Submit an update