3330 Pierce Street
Marina · San Francisco, CA 94123
-
between 1924 and 1940
A four-storey apartment building on a corner lot — the arrangement most Marina district apartment houses take, with garage doors along the street-level façades and an ornamented entry alcove between them.
-
Nov 1991
Reroofing.
-
Jan 1996
Replacement of 2 windows--scope to be clarified by bernie to.
-
Sep 2004
Replace all exterior windows.
-
Jun 2006
Remodel of kitchen & bathroom in #306. no structural work.
-
May 2009
Work @ one unit only. kitchen & bath remodel. no wall removal. new tile, plumbing fixtures & kitchen cabinets. kitchen: new cabinets, new appliances, new countertop, tile floor, finishes. bathroom: new sink, shower, toilet. no structural change.
-
May 2009
Comply with nov# 200798559. one unit: kitchen remodel in kind. one unit: kitchen remodel in kind. one unit: kitchen & bath in kind. install service door, ground floor for new electric service area, fire door type. (no exterior changes & structural work).
-
Sep 2011
Reroofing.
-
Aug 2012
Restore e fireplaces. install stainless steel liner from chimney surface down to anchor plate. ul lister material. seal smoke chamber with high temp cement. tuckpoint firebox with high heat cement.stell damper and raincop spark arrestor units: 302, 304, 306, 307, 202, 204, 206, 207, 102, 104, 106, 107. no change.
-
Oct 2012
#202- remodel of kitchen & bath upgrade, no structural work. permanent installed lighting in kitchen remodel & bathroom remodel shall comply with cec150(k)8 & cec150(k)10 respectively.
-
May 2014
One unit - kitchen remodel, new cabinets, upgrade systems. no structural work.
-
Oct 2016
Reroofing - n/a maher ord. 155-13.
-
Mar 2017
One unit kitchen & bathroom remodel & replace finishes down to studs. no structural work. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. n/a for maher.
-
Apr 2017
Perform repairs per termite report #77246, item 3a only.
-
Apr 2021
Documenting existing audibility levels of minimum 75 dba at each sleeping area.
-
Jan 2022
One unit. (1) kitchen & (1) bathroom remodel. no structural work. all appliances to remain in existing locations. no alterations of wall, window or door.
-
Feb 2022
One unit: kitchen and bath remodel. no structural work. all appliance to remain in existing locations. no alterations to outside of building.
-
Nov 2022
Wireless fire alarm system for low frequency sounders.
-
Jan 2024
One unit: remodel kitchen and bathroom, no walls removed or added. all appliances to remain in existing locations.
-
Apr 2024
Convert existing storage area into laundry room. no structural walls to be removed.
-
Nov 2024
Adding a heat detector to the laundry room.
4 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update